Abstract
A modification for the rate monotonic scheduling algorithm is presented. This modification allows a shorter delay and jitter for a class of tasks. This will result in a shorter end-to-end delay for distributed and pipelined data stream handling. Beside the advantage of the shorter delay and smaller jitter, the disadvantages of the modifications are discussed in quality and quantity. Measurement results of a split-level scheduler using the modified algorithm and a simulation of the algorithm are compared.
Preview
Unable to display preview. Download preview PDF.
References
David P. Anderson: Meta-scheduling for Distributed Continuous Media. Technical Report No. UCB/CSD 90/599, Computer Science Division (EECS) University of California, Berkeley, CA, 10 1990.
D. P. Anderson, S.-Y. Tzou, R. Wahbe, R. Govindan, and M. Andrews: Support for Continous Media in the Dash System. In Proc of the 10th International Conference on Distributed Computing Systems, pages 54–61, 5 1990.
W. Burke: Entwurf und Implementierung eines Pseudo-Echtzeit-Schedulers für AIX. Master's thesis, Institut für Mathematische Maschinen und Datenverarbeitung, FAU Erlangen Nürnberg, 2 1992.
Walter Fiederer: Entwicklung eines Ressourcen-Managers für die CPU. Master's thesis, IPVR, Universität Stuttgart, 2 1994.
Ralf Guido Herrtwich: Betriebsmittelvergabe unter Echtzeitgesichtspunkten. Informatik-Spektrum, 14(3):123–136, 6 1991.
C.L. Liu and James W. Layland: Scheduling Algorithms for Multiprogramming in a Hard-real-time Environment. Journal of the ACM, 20(1):46–61, 1 1973.
Andreas Mauthe, Werner Schulz, and Ralf Steinmetz: Inside the Heidelberg Multimedia Operating System Support: Real-time Processing of Continuous Media in OS/2. Technical Report 43.9214, ENC European Networking Center, 9 1992.
Kurt Rothermel, Ingo Barth, and Tobias Helbig: Cinema — An Architecture for Configurable Distributed Multimedia Applications. Submitted for publication.
Ralf Steinmetz: Multimedia Technologie. Springer Verlag, 1993.
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 1994 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Barth, I. (1994). Extending the rate-monotonic scheduling algorithm to get shorter delays. In: Steinmetz, R. (eds) Multimedia: Advanced Teleservices and High-Speed Communication Architectures. IWACA 1994. Lecture Notes in Computer Science, vol 868. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-58494-3_10
Download citation
DOI: https://doi.org/10.1007/3-540-58494-3_10
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-58494-0
Online ISBN: 978-3-540-49007-4
eBook Packages: Springer Book Archive