Abstract
Most traditional approaches to process modelling do not provide an analysis of critical human resources and their impact(s) on project performance and output quality. However, the ability of a software organisation to take on a new project (and its success) depends to a large extent on the capability, rather than, availability of resources. Since in contrast with software process models, project management deals with resources, software process modelling can be provided by project schedule simulation. Nevertheless, contemporary project management scheduling approaches cannot be sufficiently used for software projects, because they are concerned with resource availability and utilisation, and do not provide study, analysis and management of resource capabilities and compatibilities.
Preview
Unable to display preview. Download preview PDF.
References
Basili, V.R. and Turner, A.J., Iterative Enhancement: a Practical Technique for Software Development, IEEE Transactions on Software Engineering, SE-1, (4), (1975) 390–396
Boehm, B.W., A Spiral Model of Software Development and Enhancement, IEEE Computer, No. 21, (1988) 61–72
Conway, R.W., Maxwell, W.L., and Miller, L.W.: Theory of Scheduling, Addison-Wesley Publishing Company, (1967)
Curbs, B., Hefley, W. and Miller, S., People Capability Maturity Model (CMU/SEI-95MM-02), Pittsburgh,PA: Software Engineering Institute, Carnegie Melton University, 1995.
Dowson, M., Software Process Themes and Issues, Proceedings of the 2nd International Conference of the Software Process: Continuous Software Process Improvement, Berlin, Germany, (1993) 54–62
Kellner, M.I. and Hansen, G.A., Software Process Modeling: A Case Study, Proceedings of the 22nd Annual Hawaii International Conference on System Sciences, Vol. 2, (1989) 175–188
Meredith, J.R. and Mantel, JR, S.J., Project Management: A Managerial Approach, John Wiley&Sons, Inc., (1995)
Royce, W.W., Managing the Development of Large Software Systems: Concepts and Techniques, Proceedings of the 11th International Conference on Software Engineering, Pittsburgh, (1989) 328–338
Sachs, P., Transforming Work: Collaboration, Learning and Design, Communications of the ACM, Vol. 38, No. 9, (1995) 36–44
Sommerville, I. and Rodden, T., Human, social and organisational influences on the software processes. In A. Fuggetta and A. Wolf (ed.), Software Process, Vol. 4 of Trends in Software., J. Wiley, Chapter 4, (1996) 89–109
White, P., Process Modelling and Process Support, IOPENER, Vol. 1, No. 3, (1992) 7–8
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 1998 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Plekhanova, V. (1998). On project management scheduling where human resource is a critical variable. In: Gruhn, V. (eds) Software Process Technology. EWSPT 1998. Lecture Notes in Computer Science, vol 1487. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-64956-5_11
Download citation
DOI: https://doi.org/10.1007/3-540-64956-5_11
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-64956-4
Online ISBN: 978-3-540-49907-7
eBook Packages: Springer Book Archive