Skip to main content

Scheduling of an On-Demand Fixture Manufacturing Cell for Mass Customization: Optimal Method Vs. Heuristic

  • Conference paper
  • First Online:
Book cover Informatics in Control, Automation and Robotics (ICINCO 2017)

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 495))

  • 955 Accesses

Abstract

The onset of Industry 4.0 has led to an increased research interest in mass customization production systems. Reconfigurable jigs and fixtures are expected to facilitate customer-driven manufacturing. Scheduling of such fixtures in a mass customization system is yet to be comprehensively investigated. The chapter presents a three-stage method for the optimal scheduling of a two-cell just-in-time manufacturing system that recirculates fixtures for customized parts. The first two stages implemented clustering to produce fixture-part mappings, and intracluster sequencing to enable efficient successive fixture reconfigurations, respectively. The third stage implemented a Mixed Integer Linear Programming (MILP) model to synchronously schedule operations in the two specialized cells, such that total idle time was minimized. A heuristic was developed as an alternative to the MILP model. The paper discusses the three-stage method, with emphasis on the MILP model and Stage 3 Heuristic (S3H). The solutions were compared, and the goodness of the S3H solutions was evaluated in comparison to the optimal solutions. The S3H was found to produce solutions within a range of 5–35% of the corresponding optimal solutions, with far superior solutions times and problem size capabilities.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Yao, F., Lin, Y.: Emerging manufacturing paradigm shifts for the incoming industrial revolution. Int. J. Advanc. Manufact. Technol. 85(5), 1665–1676 (2016)

    Article  Google Scholar 

  2. Fogliatto, F.S., da Silveira, G.J.C., Borenstein, D.: The mass customization decade: An updated review of the literature. Int. J. Prod. Econ. 138(1), 14–25 (2012)

    Article  Google Scholar 

  3. Kowang, T.O., Mohd Hamel, N., Long, C.S., Mohd Rasli, A.: Operation management: project management in jig and fixture industries. Adv. Mater. Res. 931–932, 1621–1625 (2014)

    Article  Google Scholar 

  4. Nee, A.Y.C., Tao, Z., Senthil Kumar, A.: An Advanced Treatise on Fixture Design and Planning, 1st edn. World Scientific Publishing Co., Singapore (2004)

    Book  Google Scholar 

  5. Bakker, O.J., Papastathis, T.N., Ratchev, S.M., Popov, A.A.: Recent research on flexible fixtures for manufacturing processes. Recent Patents Mech. Eng. 6(2), 107–121 (2013)

    Article  Google Scholar 

  6. Bi, Z.M., Zhang, W.J.: Flexible fixture design and automation: review, issues and future directions. Int. J. Prod. Res. 39(13), 2867–2894 (2001)

    Article  Google Scholar 

  7. Groover, M.P.: Automation, Production Systems, and Computer-Integrated Manufacturing, 2nd edn. Prentice-Hall, Pennsylvania (2001)

    Google Scholar 

  8. Liao, T.W.: Group Technology and Cellular Manufacturing. In: Exploring Advanced Manufacturing Technologies, pp. 10-3-1–10-3-11. Industrial Press, New York (2003)

    Google Scholar 

  9. Ouelhadj, D., Petrovic, S.: A survey of dynamic scheduling in manufacturing systems. J. Sched. 12(4), 417–431 (2009)

    Article  MathSciNet  Google Scholar 

  10. Ku, W.-Y., Beck, J.C.: Mixed Integer Programming models for job shop scheduling: a computational analysis. Comput. Oper. Res. 73, 165–173 (2016)

    Article  MathSciNet  Google Scholar 

  11. Branke, J., Nguyen, S., Pickardt, C., Zhang, M.: Automated design of production scheduling heuristics: A review. IEEE Trans. Evol. Comput. 20(1), 110–124 (2016)

    Article  Google Scholar 

  12. Gen, M., Lin, L.: Multiobjective evolutionary algorithm for manufacturing scheduling problems: State-of-the-art survey. J. Intell. Manuf. 25(5), 849–866 (2014)

    Article  MathSciNet  Google Scholar 

  13. Shiihara, M.: Genetic algorithm on job shop scheduling problem under the batch splitting environment. Int. J. Japan Associat. Manag. Syst. 5(1), 1–7 (2013)

    Article  Google Scholar 

  14. Saidi-Mehrabad, M., Fattahi, P.: Flexible job shop scheduling with tabu search algorithms. Int. J. Advanc. Manufact. Technol. 32, 563–570 (2007)

    Article  Google Scholar 

  15. Zhou, R., Nee, Y.C., Lee, H.P.: Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems. Int. J. Prod. Res. 47(11), 2903–2920 (2009)

    Article  Google Scholar 

  16. Lim, T.L., Kow, M.Y., Nooh, A.B., Yip, M.W.: Case studies in implementing dynamic production planning and scheduling system in make-to-order high-mix-low-volume small and medium-scaled industries for production efficiency. Int. J. Innovat. Comput. 5(1), 5–8 (2015)

    Google Scholar 

  17. Doh, H.-H., Yu, J.-M., Lee, D.-H.: Priority scheduling for a flexible job shop with a reconfigurable manufacturing cell. Indust. Eng. Manag. Syst. 15(1), 11–18 (2016)

    Google Scholar 

  18. Da Silva, B.J.V., Morabito, R., Yamashitaa, Yanasse, H.H.: Production scheduling of assembly fixtures in the aeronautical industry. Comput. Indust. Eng. 67, 195–203 (2014)

    Google Scholar 

  19. Thörnblad, K.S., Strömberg, A.-B., Patriksson, M., Almgren, T.: Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, fixtures, and night shifts. 1st edn. Department of Mathematical Sciences, Division of Mathematics, Chalmers University of Technology and University of Gothenburg, Sweden (2001)

    Google Scholar 

  20. Wong, T.C., Chan, F.T.S., Chan, L.Y.: A resource-constrained assembly job shop scheduling problem with Lot Streaming technique. Comput. Ind. Eng. 57(3), 983–995 (2009)

    Article  Google Scholar 

  21. Yu, J.-M., Doh, H.-H., Kim, J.-S., Lee, D.-H., Nam, S.-H.: Scheduling for a reconfigurable manufacturing system with multiple process plans and limited pallets/fixtures. Int. J. Mechanic. Aerospace. Indust. Mechatr. Manufact. Eng. 6(2), 232–237 (2012)

    Google Scholar 

  22. Naidoo, E., Padayachee, J., Bright, G.: Optimal scheduling of an on-demand fixture manufacturing cell for mass customisation production systems—model formulation, presentation and validation. In: 14th International Conference on Informatics in Control, Automation and Robotics, pp. 17–24. SCITEPRESS, Portugal (2017)

    Google Scholar 

  23. Rokach, L., Maimon, O.: Data Mining and Knowledge Discovery Handbook, 2nd edn. Springer, New York (2010)

    MATH  Google Scholar 

  24. Lloyd, S.P.: Least squares quantization in PCM. IEEE Trans. Inf. Theor. 28(2), 129–137 (1982)

    Article  MathSciNet  Google Scholar 

  25. Kruskal, J.B.: Nonmetric multidimensional scaling: a numerical method. Psychometrika 29(2), 115–129 (1964)

    Article  MathSciNet  Google Scholar 

  26. Bar-Joseph, Z., Gifford, D.K., Jaakkola, T.S.: Fast optimal leaf ordering for hierarchical clustering. Bioinformatics 17(1), S22–S29 (2001)

    Article  Google Scholar 

  27. Wolsey, L.A.: An analysis of the greedy algorithm for the submodular set covering problem. Combinatorica 2(4), 385–393 (1981)

    Article  MathSciNet  Google Scholar 

  28. Ibaraki, T.: On the computational efficiency of branch-and-bound algorithms. J. Operat. Res. Soc. Japan 20(1), 16–35 (1977)

    Article  MathSciNet  Google Scholar 

  29. Sturrock, K., Rocha, J.: A multidimensional scaling stress evaluation table. Field Methods 12(1), 49–60 (2000)

    Article  Google Scholar 

  30. Cordeau, J., Laporte, G., Savelsbergh, M.W.P., Vigo, D.: Chapter 6 Vehicle Routing, vol. 14, pp. 367–428 (2007)

    Chapter  Google Scholar 

Download references

Acknowledgements

The financial assistance of the National Research Foundation (NRF) towards this research is hereby acknowledged (via the Blue Sky Research Grant: 91339). Opinions expressed and conclusions arrived at are those of the authors, and are not necessarily to be attributed to the NRF.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Enrico Naidoo .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Naidoo, E., Padayachee, J., Bright, G. (2020). Scheduling of an On-Demand Fixture Manufacturing Cell for Mass Customization: Optimal Method Vs. Heuristic. In: Gusikhin, O., Madani, K. (eds) Informatics in Control, Automation and Robotics . ICINCO 2017. Lecture Notes in Electrical Engineering, vol 495. Springer, Cham. https://doi.org/10.1007/978-3-030-11292-9_1

Download citation

Publish with us

Policies and ethics