Solution Algorithm for Time/Cost Trade-off Stochastic Project Scheduling Problem

  • Conference paper
  • First Online:
Book cover Operations Research Proceedings 2018

Part of the book series: Operations Research Proceedings ((ORP))

Abstract

In project management, the duration of the job is determined by the man-hour and resources inputted to the job. The duration can be shortened by increasing the amount of additional resources input. The cost increases according to the input of the resource. This problem is referred to as the Time/Cost Trade-off Problem (TCTP). In this study, the relation between time and cost is represented by an inverse proportional curve. We present a solution to the Stochastic Discrete TCTP-Curve (SDTCTP-C) in which the duration of the job is defined as a random variable.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Brooks Jr, F.P.: The Mythical Man-Month: Essays on Software Engineering, Anniversary Edition, 2nd edn. Addison-Wesley Professional, Boston (1995)

    Google Scholar 

  2. Deǧirmenci, G., Azizoǧlu, M.: Branch and bound based solution algorithms for the budget constrained discrete time/cost trade-off problem. J. Oper. Res. Soc. 64, 1474–1484 (2013)

    Google Scholar 

  3. Hazir, Ö., Haouari, M., Erel, E.: Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version. Comput. Oper. Res. 37, 649–655 (2010)

    Article  Google Scholar 

  4. Hazir, Ö., Erel, E., Günalay, Y.: Robust optimization models for the discrete time/cost trade-off problem. Int. J. Prod. Econ 130, 87–95 (2011)

    Article  Google Scholar 

  5. Jeang, A.: Project management for uncertainty with multiple objectives optimisation of time,cost and reliability. Int. J. Prod. Res. 53(5), 1503–1526 (2015)

    Article  Google Scholar 

  6. Zhu, G., Bard, J.F., Yu, G.: A two-stage stochastic programming approach for project planning with uncertain activity durations. J. Sched. 10, 167–180 (2007)

    Article  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Takayuki Shiina .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Kitamura, T., Shiina, T. (2019). Solution Algorithm for Time/Cost Trade-off Stochastic Project Scheduling Problem. In: Fortz, B., Labbé, M. (eds) Operations Research Proceedings 2018. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-030-18500-8_58

Download citation

Publish with us

Policies and ethics