Designing a Procurement Management Model to Reduce Project Delays in a Hydraulic and Automation Systems Company

  • Conference paper
  • First Online:
  • 4057 Accesses

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 1026))

Abstract

This study focuses on the factors that cause project delays in an industrial hydraulic company. More specifically, the article also addresses the development of on-demand engineered products and the impact of the procurement process on delays. As part of the investigation, the authors assessed the historical data of the projects completed in 2017 before determining the critical path for each project in an attempt to identify which project stages may be improved. After further assessing the resulting data, the planning and procurement procedures were deemed as requiring improvement. Next, the article proposes a training plan and new procedures based on the Project Management Body of Knowledge guidelines for Engineer-to-Order projects. In conclusion, the results showed that delays were effectively reduced after implementing these new procedures in both Project Management stages.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   229.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   299.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Mello, M.H., Strandhagen, J.O., Alfnes, E.: The role of coordination in avoiding project delays in an engineer-to-order supply chain. J. Manuf. Technol. Manag. 26(3), 429–454 (2015). https://doi.org/10.1108/JMTM-03-2013-0021

    Article  Google Scholar 

  2. Ghiasi, V., Kaivan, E., Arzjani, N., Arzjani, D.: Analyzing the causes of delay in development projects by fuzzy analysis. Int. J. Qual. Reliab. Manag. 34, 1412–1430 (2017). https://doi.org/10.1108/IJQRM-08-2016-0134

    Article  Google Scholar 

  3. Pham, L.H., Hadikusumo, H.: Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam. Int. J. Energy Sect. Manage. 8(1), 3–26 (2014)

    Article  Google Scholar 

  4. Mello, M.H., Strandhagen, J.O., Alfnes, E.: Analyzing the factors affecting coordination in engineer-to-order supply chain. Int. J. Oper. Prod. Manag. 35(7), 1005–1031 (2015)

    Article  Google Scholar 

  5. Zare, R., Chavez, P., Raymundo, C., Rojas, J.: Collaborative culture management model to improve the performance in the inventory management of a supply chain. In: 2018 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2018 - Proceedings (2018). 8587073

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Melanie Vereau , Jose Rojas , Daniel Aderhold , Carlos Raymundo or Francisco Dominguez .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Vereau, M., Rojas, J., Aderhold, D., Raymundo, C., Dominguez, F. (2020). Designing a Procurement Management Model to Reduce Project Delays in a Hydraulic and Automation Systems Company. In: Ahram, T., Karwowski, W., Pickl, S., Taiar, R. (eds) Human Systems Engineering and Design II. IHSED 2019. Advances in Intelligent Systems and Computing, vol 1026. Springer, Cham. https://doi.org/10.1007/978-3-030-27928-8_142

Download citation

Publish with us

Policies and ethics