Skip to main content

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 1051))

Abstract

To ensure proper functioning of an organization (e.g. production system) in settings in which there exists a risk of disruptions caused by unexpected employee absenteeism and/or a changing demand for employees with specific qualifications, one must move away from traditional approaches oriented towards the determination of procedures for generating workable baseline schedules that minimize the project makespan in a deterministic environment. The planner must take into account time uncertainties caused by an unexpected deviation of activity durations and resource availability uncertainties related to the fact that execution of tasks in a project depends on the availability of resources. The aim of this study was to develop a method “determining” a competence structure of employees, allowing for realizing proactive planning robust to unexpected staff absenteeism. To this end, we proposed a procedure for designing a competence framework that returns competence structures robust to disruptions caused by employee absenteeism. The procedure, derived from a declarative model, can be used to determine structures that allow to substitute redundant competences, thus ensuring robustness of the generated schedules to the types of absenteeism that are known a priori. The possibilities of practical application of the presented approach are illustrated with examples.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Abernathy, W., Baloff, N., Hershey, J.: A three-stage man power planning and scheduling model - a service sector example. Oper. Res. 21, 693–711 (1973)

    Article  Google Scholar 

  2. Antosz, K.: Maintenance – identification and analysis of the competency gap. Eksploatacja i Niezawodnosc – Maintenance Reliab. 20(3), 484–494 (2018)

    Article  Google Scholar 

  3. Banaszak, Z., Bocewicz, G.: Declarative modeling for production order portfolio scheduling. Found. Manage. 6(3), 7–24 (2014)

    Article  Google Scholar 

  4. Bombiak, E.: Human resources risk as an aspect of human resources management in turbulent environments. In: Pînzaru, F., Zbuchea, A., Brătianu, C., Vătămănescu, E.M., Mitan, A. (eds.) Shift! Major Challenges of Today’s Economy, pp. 121–132. Tritonic Publishing House, Bucharest (2017)

    Google Scholar 

  5. Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty: survey and research directions. In: 2014 International Conference on Advanced Logistics and Transport (ICALT), Hammamet, pp. 229–234 (2014). https://doi.org/10.1109/icadlt.2014.6866316

  6. Hadi, M., Shadrokh, S.: A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration. Int. J. Prod. Res. 57(10), 3138–3167 (2019). https://doi.org/10.1080/00207543.2018.1552371

    Article  Google Scholar 

  7. Hazir, O., Haouari, M., Erel, E.: Robust scheduling and robustness measures for the discrete time/cost trade-off problem. Eur. J. Oper. Res. 207(1), 633–643 (2010)

    Article  MathSciNet  Google Scholar 

  8. Herroelen, W., Leus, R.: Project scheduling under uncertainty: survey and research potentials. Eur. J. Oper. Res. 165, 289–306 (2005). https://doi.org/10.1016/j.ejor.2004.04.002

    Article  MATH  Google Scholar 

  9. Klimek, M., Łebkowski, P.: Robustness of schedules for project scheduling problem with cash flow optimisation. Bull. Pol. Acad. Sci. Tech. Sci. 61(4), 1005–1015 (2013). https://doi.org/10.2478/bpasts-2013-0108

    Article  MATH  Google Scholar 

  10. Klimek, M., Łebkowski, P.: Robust Buffer allocation for scheduling of a project with predefined milestones. Decis. Making Manuf. Serv. 3(1–2), 49–72 (2009). https://doi.org/10.7494/dmms.2009.3.2.49

    Article  MathSciNet  MATH  Google Scholar 

  11. Korytkowski, P.: Competences-based performance model of multi-skilled workers with learning and forgetting. Expert Syst. Appl. 77, 226–235 (2017)

    Article  Google Scholar 

  12. Potthoff, D., Huisman, D., Desaulniers, G.: Column generation with dynamic duty selection for railway crew rescheduling. Transp. Sci. 44(4), 493–505 (2010)

    Article  Google Scholar 

  13. Wikarek, J.: Implementation aspects of hybrid solution framework. In: Recent Advances in Automation, Robotics and Measuring Techniques. Advances in Intelligent Systems and Computing, vol. 267, pp. 317–328 (2014). https://doi.org/10.1007/978-3-319-05353-0_31

    Chapter  Google Scholar 

  14. Stijn, V.V.: Proactive-reactive procedures for robust project scheduling. Ph.D. theses, no. 247, Faculteit Economische En Toegepaste, Economische Wetenschappen, Katholieke Universiteit Leuven (2006)

    Google Scholar 

  15. Szwarc, E., Bocewicz, G., Bach-Dąbrowska, I.: Planning a teacher staff competence structure robust to unexpected personnel absence. In: Manufacturing Modelling, Management and Control (MIM), Berlin (2019, in print)

    Google Scholar 

  16. Szwarc, E., Bach-Dąbrowska, I., Bocewicz, G.: Competence management in teacher assignment planning. In: Damaševičius, R., Vasiljevienė, G. (eds.) Information and Software Technologies, ICIST 2018. CCIS, vol. 920, pp. 449–460 (2018)

    Google Scholar 

  17. Tam, B., Ehrgott, M., Ryan, D.M., Zakeri, G.: A comparison of stochastic programming and bi-objective optimisation approaches to robust airline crew scheduling. OR Spectrum 33(1), 49–75 (2011)

    Article  MathSciNet  Google Scholar 

  18. Topaloglu, S., Selim, H.: Nurse scheduling using fuzzy modelling approach. Fuzzy Sets Syst. 161(11), 1543–1563 (2010). https://doi.org/10.1016/j.fss.2009.10.003

    Article  MATH  Google Scholar 

  19. Van den Bergh, J., Beliën, J., De Bruecker, P., Demeulemeester, E., De Boeck, L.: Personnel scheduling: a literature review. Eur. J. Oper. Res. 226, 367–385 (2013)

    Article  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Grzegorz Bocewicz .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Bocewicz, G., Wikarek, J., Sitek, P., Banaszak, Z. (2020). Robust Competence Allocation for Multi-project Scheduling. In: Świątek, J., Borzemski, L., Wilimowska, Z. (eds) Information Systems Architecture and Technology: Proceedings of 40th Anniversary International Conference on Information Systems Architecture and Technology – ISAT 2019. ISAT 2019. Advances in Intelligent Systems and Computing, vol 1051. Springer, Cham. https://doi.org/10.1007/978-3-030-30604-5_2

Download citation

Publish with us

Policies and ethics