Skip to main content

Lean Manufacturing Model of Production Management Make to Order Based on QRM to Reduce Order Delivery Times in Metal-Mechanical SMEs

  • Conference paper
  • First Online:
  • 3273 Accesses

Part of the book series: Lecture Notes in Networks and Systems ((LNNS,volume 319))

Abstract

Factors such as the lack of standardization of processes and unproductive times in manufacturing companies cause deficiencies in production processes, this in turn causes delays in the delivery of finished products. Given the problem, the use of Lean-QRM is proposed as a solution model to reduce the delivery times of orders in SMEs, both methodologies complement each other and are aimed at improving efficiency in companies with production-to-order systems. For this reason, the research carried out seeks to implement a model focusing on increasing efficiency in the production area of the company under study in order to improve the performance of on-time deliveries (OTD). The results suggest a minimum increase of 1.5% in the delivery of orders on time.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   99.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   129.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Singh, J., Singh, H., Singh, G.: Productivity improvement using lean manufacturing in manufacturing industry of Northern India: a case study. Int. J. Prod. Perform. Manag. 67(8), 1394–1415 (2018)

    Article  Google Scholar 

  2. Reporte de Producción Manufacturera. Oficina de Estudios Económicos, pp.15–20 (2018). http://demi.produce.gob.pe/images/publicaciones/publi5b7837a60dc4ceb84_4.pdf. Accessed 15 Jan 2020

  3. COMEX - Sociedad de Comercio Exterior del Perú. MAYOR DINAMISMO EN LOS SECTORES QUÍMICO Y METALMECÁNICO (2020). https://www.comexperu.org.pe/articulo/mayor-dinamismo-en-los-sectores-quimico-y-metalmecanico. Accessed 20 Jan 2020

  4. METALMECÁNICA ES CLAVE PARA EL DESARROLLO. 1st ed. Lima (2019). https://www.camaralima.org.pe/repositorioaps/0/0/par/r874_3/comercio%20exterior.pdf. Accessed 15 Apr 2019

  5. De Oliveira, R.P., Stefenon, S.F., Branco, N.W., De Oliveira, J.R., Rohloff, R.C.: Lean manufacturing in association to the industrial automation: Case study applied to furniture industry. Espacios 38(17), 24–40 (2017)

    Google Scholar 

  6. Dhingra, A.K., Kumar, S., Singh, B.: Cost reduction and quality improvement through Lean-Kaizen concept using value stream map in Indian manufacturing firms. Int. J. Syst. Assur. Eng. Manag. 10(4), 792–800 (2019). https://doi.org/10.1007/s13198-019-00810-z

    Article  Google Scholar 

  7. Ekincioğlu, C., Boran, S.: SMED methodology based on fuzzy Taguchi method. J. Enterpr. Inf. Manag. 31(6), 867–878 (2018)

    Article  Google Scholar 

  8. Lorente Leyva, L.L., et al.: Applying lean manufacturing in the production process of rolling doors: a case study. J. Eng. Appl. Sci. 13(7), 1774–1781 (2018)

    Google Scholar 

  9. Modi, K., Lowalekar, H., Bhatta, N.M.K.: Revolutionizing supply chain management the theory of constraints way: a case study. Int. J. Prod. Res. 57(11), 3335–3361 (2019)

    Article  Google Scholar 

  10. Leonardo, D.G., Sereno, B., Da Silva, D.S.A., Sampaio, M., Massote, A.A., Simões, J.C.: Implementation of hybrid Kanban-CONWIP system: a case study. J. Manuf. Technol. Manag. 28(6), 714–736 (2017)

    Article  Google Scholar 

  11. Rosa, C., Silva, F.J.G., Ferreira, L.P., Campilho, R.: SMED methodology: the reduction of setup times for Steel Wire-Rope assembly lines in the automotive industry. Procedia Manuf. 13, 1034–1042 (2017)

    Article  Google Scholar 

  12. Saravanan, V., Nallusamy, S., Balaji, K.: Lead time reduction through execution of lean tool for productivity enhancement in small scale industries. Int. J. Eng. Res. Africa 34, 116–127 (2018)

    Article  Google Scholar 

  13. Nallusamy, S., Saravanan, V.: Optimization of process flow in an assembly line of manufacturing unit through lean tools execution. Int. J. Eng. Res. Africa 38, 133–143 (2018)

    Article  Google Scholar 

  14. Nallusamy, S., Adil Ahamed, M.A.: Implementation of lean tools in an automotive industry for productivity enhancement - a case study. Int. J. Eng. Res. Africa 29, 175–185 (2017)

    Article  Google Scholar 

  15. Stadnicka, D., Litwin, P.: Value stream mapping and system dynamics integration for manufacturing line modelling and analysis. Int. J. Prod. Econ. 208, 400–411 (2019)

    Article  Google Scholar 

  16. Gracia, J., Lara, L., Quintero, D., Santis, A.: Formulation of strategies for the implementation of integral management system based on ISO 9001:2015 and 14001:2015 in the company surtiapliques (Bogotá-Colombia). Chem. Eng. Trans. 67, 559–564 (2018)

    Google Scholar 

  17. Saravanan, V., Nallusamy, S., George, A.: Efficiency enhancement in a medium scale gearbox manufacturing company through different lean tools - a case study. Int. J. Eng. Res. Africa 34, 128–138 (2018)

    Article  Google Scholar 

  18. Singh, J., Singh, H., Singh, D., Singh, K.: Evaluating lean thinking using value stream mapping in manufacturing industry - a case study. Int. J. Prod. Qual. Manag. 22(1), 101–116 (2017)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Carlos Raymundo .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Huayllasco-Martinez, D., Chavez-Ccencho, E., Carlos-Peñafiel, J., Raymundo, C. (2022). Lean Manufacturing Model of Production Management Make to Order Based on QRM to Reduce Order Delivery Times in Metal-Mechanical SMEs. In: Ahram, T., Taiar, R. (eds) Human Interaction, Emerging Technologies and Future Systems V. IHIET 2021. Lecture Notes in Networks and Systems, vol 319. Springer, Cham. https://doi.org/10.1007/978-3-030-85540-6_52

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-85540-6_52

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-85539-0

  • Online ISBN: 978-3-030-85540-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics