Skip to main content

Visual Data and Predictive Analytics for Proactive Project Controls on Construction Sites

  • Conference paper
  • First Online:
Advanced Computing Strategies for Engineering (EG-ICE 2018)

Part of the book series: Lecture Notes in Computer Science ((LNISA,volume 10863))

Abstract

This paper presents the theoretical foundation for a project controls system that improves understanding of how construction performance can be captured, communicated, and analyzed in form of a visual production system; predicts and effectively communicates the reliability of the weekly work plan and look-ahead schedules, supports root-cause assessment on plan failure at both project and task-levels; facilitates information flows; and decentralizes decision-making. Our model-driven system builds upon novel visual data analytics to map the current state of production in 4D (3D+time), compare to 4D BIM, and expose waste at both project and task-levels. Using predictive analytics and based on actual progress and productivity data, reliability in the future state of production is forecasted to highlight potential issues in a location-driven scheme and support collaborative decision making that eliminates root causes of waste. To evaluate the performance of our system, several case studies are conducted on real-world commercial building projects. It is shown that the developed system provides visual interfaces between people and information on and offsite, enables effective pull flows, decentralizes work tracking, facilitates in-process quality control and hand-overs among contractors, and most importantly transforms retroactive and task-driven workflows in contractor coordination meetings to proactive location-driven practices.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Abeid, J., Allouche, E., Arditi, D., Hayman, M.: PHOTO-NET II: a computer-based monitoring system applied to project management. Autom. Constr. 12, 603–616 (2003). https://doi.org/10.1016/S0926-5805(03)00042-6

    Article  Google Scholar 

  2. Abeid, J., Arditi, D.: Linking time-lapse digital photography and dynamic scheduling of construction operations. J. Comput. Civ. Eng. 16, 269–279 (2002). https://doi.org/10.1061/(asce)0887-3801(2002)16:4(269)

    Article  Google Scholar 

  3. Alarcón, L.F., Diethelm, S., Rojo, O., Calderón, R.: Evaluando los impactos de la implementación de lean construction. Rev. Ing. Constr. 23, 26–33 (2008)

    Google Scholar 

  4. Aritua, B., Smith, N.J., Bower, D.: Construction client multi-projects–a complex adaptive systems perspective. Int. J. Proj. Manag. 27, 72–79 (2009)

    Article  Google Scholar 

  5. Bae, H., Golparvar-Fard, M., White, J.: High-precision vision-based mobile augmented reality system for context-aware architectural, engineering, construction and facility management (AEC/FM) applications. Vis. Eng. 1, 3 (2013)

    Article  Google Scholar 

  6. Bae, H., Golparvar-Fard, M., White, J.: High-precision vision-based mobile augmented reality system for context-aware architectural, engineering, construction and facility management (AEC/FM) applications. Vis. Eng. 1, 1–13 (2013)

    Article  Google Scholar 

  7. Ballard, G.: The last planner system of production control. The University of Birmingham (2000)

    Google Scholar 

  8. Ballard, G., Howell, G.: Implementing lean construction: stabilizing work flow. Lean Constr. (1994)

    Google Scholar 

  9. Bortolazza, R.C., Costa, D.B., Formoso, C.T., et al.: A quantitative analysis of the implementation of the last planner system in Brazil. In: 13th Conference of the International Group for Lean Construction, pp. 413–420. International Group on Lean Construction (2005)

    Google Scholar 

  10. Bosché, F., Guillemet, A., Turkan, Y., Haas, C., Haas, R.: Tracking the built status of MEP works: assessing the value of a Scan-vs-BIM System. J. Comput. Civ. Eng. (2013)

    Google Scholar 

  11. Brodetskaia, I., Sacks, R., Shapira, A.: Stabilizing production flow of interior and finishing works with reentrant flow in building construction. J. Constr. Eng. Manag. 139, 665–674 (2013). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000595

    Article  Google Scholar 

  12. Changali, S., Azam, M., van Nieuwland, M.: The construction productivity imperative (2015)

    Google Scholar 

  13. Dave, B., Hämäläinen, J.-P., Koskela, L.: Exploring the recurrent problems in the last planner implementation on construction projects, pp. 1–10 (2015)

    Google Scholar 

  14. Dave, B., Kubler, S., Främling, K., Koskela, L.: Addressing information flow in lean production management and control in construction. In: Proceedings of the 22nd International Group for Lean Construction, vol. 2, pp. 581–592 (2014)

    Google Scholar 

  15. Earthcam: EarthCam - Webcam Network (2015)

    Google Scholar 

  16. Eastman, C., Teicholz, P., Sacks, R., Liston, K.: BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. John Wiley & Sons, Hoboken (2011)

    Google Scholar 

  17. Fuhrmann, S., Langguth, F., Goesele, M.: MVE: a multi-view reconstruction environment. In: Proceedings of the Eurographics Workshop on Graphics and Cultural Heritage. Eurographics Association, Aire-la-Ville, Switzerland, pp. 11–18 (2014)

    Google Scholar 

  18. Garcia-Lopez, N.P., Fischer, M.: A system to track work progress at construction jobsites. In: The Industrial and Systems Engineering Research Conference (2014)

    Google Scholar 

  19. Golparvar-Fard, M., Peña-Mora, F., Arboleda, C.A., Lee, S.: Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs. J. Comput. Civ. Eng. 23, 391–404 (2009)

    Article  Google Scholar 

  20. Golparvar-Fard, M., Pena-Mora, F., Savarese, S.: D4AR-A 4-Dimensional augmented reality model for automating construction progress data collection, processing and communication. J. ITCON – Spec. Issue Next Gener. Constr. IT Technol. Foresight Futur. Stud. Roadmapping Scenar. Plan 14, 129–153 (2009)

    Google Scholar 

  21. Golparvar-Fard, M., Peña-Mora, S., Savarese, S.: Automated model-based progress monitoring using unordered daily construction photographs and IFC as-planned models. ASCE J. Comput. Civ. Eng. (2012)

    Google Scholar 

  22. Golparvar-Fard, M., Peña-Mora, S., Savarese, S.: Automated model-based progress monitoring using unordered daily construction photographs and IFC as-planned models. ASCE J. Comput. Civ. Eng. 147 (2012). https://doi.org/10.1061/(asce)cp.1943-5487.0000205

  23. Golparvar‐Fard, M., Peña‐Mora, F., Savarese, S.: Automated progress monitoring using unordered daily construction photographs and IFC‐Based building information models. J. Comput. Civ. Eng. 147 (2012)

    Google Scholar 

  24. Gurevich, U., Sacks, R.: Examination of the effects of a KanBIM production control system on subcontractors’ task selections in interior works. Autom. Constr. 37, 81–87 (2014). https://doi.org/10.1016/j.autcon.2013.10.003

    Article  Google Scholar 

  25. Hamzeh, F., Ballard, G., Tommelein, I.: Rethinking lookahead planning to optimize construction workflow. Lean Constr. J., 15–34 (2012)

    Google Scholar 

  26. Hamzeh, F., Bergstrom, E.: The lean transformation: a framework for successful implementation of the last PlannerTM system in construction. In: Proceedings of the 46th Annual International Conference of the Associated Schools of Construction (2010)

    Google Scholar 

  27. Hamzeh, F.R., Saab, I., Tommelein, I.D., Ballard, G.: Understanding the role of “tasks anticipated” in lookahead planning through simulation. Autom. Constr. 49, 18–26 (2015). https://doi.org/10.1016/j.autcon.2014.09.005

    Article  Google Scholar 

  28. Han, K.K., Cline, D., Golparvar-Fard, M.: Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs. Adv. Eng. Inform. 29, 889–901 (2015). https://doi.org/10.1016/j.aei.2015.10.006

    Article  Google Scholar 

  29. Han, K.K., Golparvar-Fard, M.: Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs. Autom. Constr. 53, 44–57 (2015)

    Article  Google Scholar 

  30. Han, K.K., Golparvar-Fard, M.: Potential of big visual data and building information modeling for construction performance analytics: an exploratory study. Autom. Constr. 73, 184–198 (2017). https://doi.org/10.1016/j.autcon.2016.11.004

    Article  Google Scholar 

  31. JobSiteVisitor: JobsiteVisitor.com (2015)

    Google Scholar 

  32. Kamat, V.R., Akula, M.: Integration of global positioning system and inertial navigation for ubiquitous context-aware engineering applications. In: Proceedings of the National Science Foundation Grantee Conference, Atlanta, GA, pp. 1–10

    Google Scholar 

  33. Kamat, V.R., Martinez, J.C., Fischer, M., Golparvar-Fard, M., Peña-Mora, F., Savarese, S.: Research in visualization techniques for field construction. J. Constr. Eng. Manag. 137, 853–862 (2010)

    Article  Google Scholar 

  34. Koskela, L., Howell, G.: The underlying theory of project management is obsolete. IEEE Eng. Manag. Rev. 36, 22–34 (2008). https://doi.org/10.1109/EMR.2008.4534317

    Article  Google Scholar 

  35. Leigard, A., Pesonen, S.: Defining the path - a case study of large scale implementation of last planner. In: Proceedings of the 18th Annual Conference of the International Group for Lean Construction, vol. 1, pp. 1–10 (2010)

    Google Scholar 

  36. Lindhard, S., Wandahl, S.: Improving onsite scheduling: looking into the limits of last planner system. Built Hum. Environ. Rev. 6, 46–60 (2013)

    Google Scholar 

  37. Mace, B., Balfour, B., Jones, S.: How satisfied, really satisfied, are Owners? (2016)

    Google Scholar 

  38. MultiVista: Multivista Construction Documentation Photos, Videos & WebCams (2015)

    Google Scholar 

  39. Sacks, R., Barak, R., Belaciano, B., Gurevich, U., Pikas, E.: Kanbim workflow management system: prototype implementation and field testing. Lean Constr. J. 9, 19–34 (2013)

    Google Scholar 

  40. Sacks, R., Koskela, L., Dave, B.A., Owen, R.: Interaction of lean and building information modeling in construction. J. Constr. Eng. Manag. 136, 968–980 (2010). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000203

    Article  Google Scholar 

  41. Sacks, R., Radosavljevic, M., Barak, R.: Requirements for building information modeling based lean production management systems for construction. Autom. Constr. 19, 641–655 (2010). https://doi.org/10.1016/j.autcon.2010.02.010

    Article  Google Scholar 

  42. Son, H., Bosché, F., Kim, C.: As-built data acquisition and its use in production monitoring and automated layout of civil infrastructure: a survey. Adv. Eng. Inform. 29, 172–183 (2015). https://doi.org/10.1016/j.aei.2015.01.009

    Article  Google Scholar 

  43. Staub-French, S., Khanzode, A.: 3D and 4D modeling for design and construction coordination: Issues and lessons learned. ITcon 12, 381–407 (2007). http://www.itcon.org/2007/26

    Google Scholar 

  44. Turkan, Y., Bosche, F., Haas, C., Haas, R.: Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 22, 414–421 (2012)

    Article  Google Scholar 

  45. Yang, J., Park, M.-W., Vela, P.A., Golparvar-Fard, M.: Construction performance monitoring via still images, time-lapse photos, and video streams: now, tomorrow, and the future. Adv. Eng. Inform. 29, 211–224 (2015)

    Article  Google Scholar 

Download references

Acknowledgement

This material is in part based upon work supported by the National Science Foundation Grant #1446765. The support and help of our industrial collaborators in collecting data and implementing the work tracking system is greatly appreciated. The opinions, findings, and conclusions or recommendations expressed are those of the authors and do not reflect the views of the NSF, or the industrial partner mentioned above.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jacob J. Lin .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG, part of Springer Nature

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Lin, J.J., Golparvar-Fard, M. (2018). Visual Data and Predictive Analytics for Proactive Project Controls on Construction Sites. In: Smith, I., Domer, B. (eds) Advanced Computing Strategies for Engineering. EG-ICE 2018. Lecture Notes in Computer Science(), vol 10863. Springer, Cham. https://doi.org/10.1007/978-3-319-91635-4_21

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-91635-4_21

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-91634-7

  • Online ISBN: 978-3-319-91635-4

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics