Abstract
As a practical generalization of the job shop scheduling problem, multi-resource job shop scheduling problem (MRJSSP) is discussed in this paper. In this problem, operations may be processed by a type of resources and jobs have individual deadlines. How to design and optimize this problem with DSAFO, a novel multi-agent algorithm, is introduced in detail by a case study, including problem analysis, agent role specification, and parameter selection. Experimental results show the effectiveness and efficiency of designing and optimizing MRJSSPs with multi-agent.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Jain, A.S., Meeran, S.: Deterministic Job-Shop Scheduling: Past, Present and Future. European Journal of Operational Research 113(2), 390–434 (1999)
Perregaard, M.: Branch and Bound Method for the Multiprocessor Jobshop and Flowshop Scheduling Problem. Master Thesis, Departement of Computer Science, University of Copenhagen, Danemark (1995)
Cesta, A., Oddi, A., Smith, S.F: Iterative flattening: a scalable method for solving multi-capacity scheduling problems. In: Proceedings of the Seventeenth National Conference on Artificial intelligence and Twelfth Conference on innovative Applications of Artificial intelligence (July 30 - August 03, 2000). AAAI Press / The MIT Press, pp. 742–747 (2000)
Nuijten, W.P.M., Aarts, E.H.L.: A Computational Study of Constraint Satisfaction for Multiple Capacitated Job Shop Scheduling. European Journal of Operational Research 90(2), 269–284 (1996)
Garey, M.R., Johnson, D.S.: Computers and Intractability - a Guide to the Theory of NP-completeness. W.H. Freeman and Company, New York (1979)
Yokoo, M., Durfee, E.H., Ishida, T., Kuwabara, K.: The Distributed Constraint Satisfaction Problem: Formalization and Algorithms. IEEE Transactions on Knowledge and Data Engineering 10(5), 673–685 (1998)
Fan, W., Xue, F.: Optimize Cooperative Agents with Organization in Distributed Scheduling System. In: Huang, D.-S., Li, K., Irwin, G.W. (eds.) ICIC 2006. LNCS (LNAI), vol. 4114, pp. 502–509. Springer, Heidelberg (2006)
Xing, J., Liu, S., Fan, W., Ji, L.: Design of Airport Ground Service System Based on Multi-Agent. Journal of Civil Aviation University of China 24(3), 24–27 (2006) (in Chinese)
Stützle, T., Hoos, H.: The MAX-MIN Ant System and Local Search for The Traveling Salesman Problem. In: Proceedings of the Fourth International Conference on Evolutionary Computation (ICEC’97), pp. 308–313. IEEE Press, Los Alamitos (1997)
Stützle, T., Hoos, H.: Improvements on the Ant System: Introducing MAX–MIN Ant system. In: Proceedings of the International Conference on Artificial Neural Networks and Genetic Algorithms, pp. 245–249. Springer, Wien (1997)
Fan, W., Zhang, G., Xue, F.: Design and Implementation of Airline Ground Services Mas Development Platform. In: Shi, C.Y., Shi, Z.Z., et al. (eds.) First Conference on Multi-agent Theory and Application, Yantai, China. Journal of Computer Research and Development, vol. 43 (s1), pp. 414–419 (2006)
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 2007 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Xue, F., Fan, W. (2007). Multi-agent Optimization Design for Multi-resource Job Shop Scheduling Problems. In: Huang, DS., Heutte, L., Loog, M. (eds) Advanced Intelligent Computing Theories and Applications. With Aspects of Artificial Intelligence. ICIC 2007. Lecture Notes in Computer Science(), vol 4682. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-74205-0_123
Download citation
DOI: https://doi.org/10.1007/978-3-540-74205-0_123
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-74201-2
Online ISBN: 978-3-540-74205-0
eBook Packages: Computer ScienceComputer Science (R0)