Skip to main content

Collaborative Production-Distribution Planning for Semiconductor Production Turnkey Service

  • Conference paper
Computational Science and Its Applications – ICCSA 2007 (ICCSA 2007)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 4705))

Included in the following conference series:

Abstract

Semiconductor production turnkey service (SPTS) coordinates wafer fabrication with the outsourcing of the remaining processes including circuit probing testing (C/P testing), integrated circuit (IC) assembly and final testing for buyers. To reduce the production cost and lead time in the supply chain, wafer fabricators must be responsible for the production and distribution planning for the SPTS. Therefore, this research develops an integer-programming (IP) -based model of collaborative production-distribution planning. Under this model, multi-products, multi-stages, and multi-outsourcing factories with different processing capabilities are considered. However, the IP model cannot solve the problem within a polynomial time when the problem becomes as complicated as those in real practice. To confront this problem, we adopt and modify the generalized saving algorithm (GSA) so that the proposed algorithm can solve complicated real-world problems efficiently. The numerical results show that the proposed algorithm can significantly increase the solving efficiency.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Boctor, F.F., Laporte, G., Renaud, J.: Heuristics for the traveling purchaser problem. Computers and Operations Research. 30, 491–504 (2003)

    Article  MATH  Google Scholar 

  2. Cohen, M.A., Lee, H.L.: Strategic analysis of integrated production-distribution systems: models and methods. Operations Research 36(2), 216–228 (1988)

    Google Scholar 

  3. Cohen, M.A,, Moon, S.: An integrated plant loading model with economies of scale and scope. European Journal of Operational Research 50, 266–279 (1991)

    Article  MATH  Google Scholar 

  4. Dantzig, G., Fulkerson, R., Johnson, S.: Solution of a large-scale traveling salesman problem. Journal of the Operations Research Society of America 2(4), 393–410 (1954)

    MathSciNet  Google Scholar 

  5. Dhaenens-Flipo, C., Finke, G.: An integrated model for an industrial production-distribution problem. IIE Transaction 33, 705–715 (2001)

    Google Scholar 

  6. Golden, B.L., Levy, L., Dahl, R.: Two generalization of the traveling salesman problem. OMEGA 9, 439–445 (1981)

    Article  Google Scholar 

  7. Hwang, H.W.: A framework and development of virtual fab. Winbond electronic corporation (1998)

    Google Scholar 

  8. Ong, H.L.: Approximate algorithms for the traveling purchaser problem. Operations Research Letters 1, 201–205 (1982)

    Article  MATH  Google Scholar 

  9. Pearn, W.L.: On the traveling purchaser problem. IEM working paper. 91-01. National Chaio Tung University (1991)

    Google Scholar 

  10. Pearn, W.L., Chien, R.C.: Improved solutions for the traveling purchaser problem. Computer & Operations Research 25, 879–885 (1998)

    Article  MATH  Google Scholar 

  11. Ramesh, T.: Traveling purchaser problem. OPSEARCH (India) 18(2), 78–91 (1981)

    MATH  MathSciNet  Google Scholar 

  12. Traveling Salesman Problem, http://www.tsp.gatech.edu/index.html

  13. William, J.: Heuristic techniques for simultaneous scheduling of production and distribution in multi-echelon structures: theory and empirical comparisons. Management Science 27, 336–351 (1981)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Osvaldo Gervasi Marina L. Gavrilova

Rights and permissions

Reprints and permissions

Copyright information

© 2007 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Chung, SH., Chung, IP., Lee, A.H.I. (2007). Collaborative Production-Distribution Planning for Semiconductor Production Turnkey Service. In: Gervasi, O., Gavrilova, M.L. (eds) Computational Science and Its Applications – ICCSA 2007. ICCSA 2007. Lecture Notes in Computer Science, vol 4705. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-74472-6_70

Download citation

  • DOI: https://doi.org/10.1007/978-3-540-74472-6_70

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-74468-9

  • Online ISBN: 978-3-540-74472-6

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics