Skip to main content

Practical SPI Planning

  • Conference paper
Software Process Improvement (EuroSPI 2008)

Part of the book series: Communications in Computer and Information Science ((CCIS,volume 16))

Included in the following conference series:

Abstract

This paper presents a practical procedure named P4SPI for planning, monitoring and closing an SPI. Planning activities are performed using PMBOK’s process areas as a reference; monitoring activities using Six Sigma tools and techniques and closing activities using gathering qualitative and quantitative information about the SPI Implementation. These activities are supported by office templates.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 99.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 129.00
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Aaen, I., Arent, J., Mathiassen, L., Ngwenyama, O.: A Conceptual MAP of Software. Process Improvement, Scandinavian Journal of Information Systems 13(1) (2001)

    Google Scholar 

  2. Ahern, D.: CMMI SCAMPI Distilled. Addison Wesley, Reading (2005)

    Google Scholar 

  3. Appleton, B.: Patterns for Conducting Process Improvement. In: PLoP 1997 conference (1997)

    Google Scholar 

  4. Babacan, B.: An Application of 6 Sigma Methodology for Project Management Process Improvement. In: PICMET 2006 Proceedings (2006)

    Google Scholar 

  5. Blair, G.: Planning a project. Engineering Management Journal (1993)

    Google Scholar 

  6. Making Software Process Improvement Happen. Gothenburg Studies in Applied Information Technology. IT University of Gothenburg. Doctoral Dissertation (2006)

    Google Scholar 

  7. Cadle, J., Yeates, I.: Project Management for Information Systems, 3rd edn. Pearson Education Limited, Sydney (2002)

    Google Scholar 

  8. Clark, T.A.: Project Management for Planners: A Practical Guide. Planners Press, American Planning Association (2002)

    Google Scholar 

  9. Cuevas, G., Gil, M.Á.: Mejora rápida en los procesos de desarrollo de software, II Congreso Nacional de Ingeniería de Telecomunicación. Madrid (1998)

    Google Scholar 

  10. Jiang, J., Klein, G.: An exploration of the relationship between software development process maturity and project performance. Information & Management 41 (2003)

    Google Scholar 

  11. Emam, K., Briand, L.: Costs and benefits of Software Process Improvement. International Software Engineering Research Network technical report (1997)

    Google Scholar 

  12. Kautz, H., Hansen, W., Thaysen, K.: Applying and adjusting a software process improvement model in practice. In: ICSE 2000, pp. 626–633 (2000)

    Google Scholar 

  13. Kwon, S., Shin, K.: PPSS: CBR System for ERP Project Preplanning. In: Kim, T.G. (ed.) AIS 2004. LNCS (LNAI), vol. 3397, pp. 157–166. Springer, Heidelberg (2005)

    Google Scholar 

  14. Garcia, J.: Aproximación Formal para la mejora de procesos de software. Univesidad Carlos III de Madrid. Tesis Doctoral (2001)

    Google Scholar 

  15. GartnerGroup, Moderate Process Rigor Is Faster (In the Long Run..). Stanford GartnerGroup (2000)

    Google Scholar 

  16. Landaeta, J., Garcia, J., Amescua, A.: QFD4SPI: A Technique to Monitor and Control Software Process Improvement Programs. In: EuroSPI 2007 (2007)

    Google Scholar 

  17. Landaeta, J., Garcia, J., Amescua, A.: Estimación Formal de un SPI. Universidad Carlos III de Madrid (2008)

    Google Scholar 

  18. Leung, H.: Slow change of information system development practice. Software Quality Journal 8(3), 197–210 (1999)

    Article  Google Scholar 

  19. Leung, H., Liao, L., Qu, Y.: Automated support of software quality improvement. International Journal of Quality & Reliability Management 24(3), 230–243 (2007)

    Article  Google Scholar 

  20. Li, J., Ruhe, G.: Decision Support Analysis for Software Effort Estimation by Analogy. In: Third International Workshop on Predictor Models in Software Engineering. IEEE, Los Alamitos (2007)

    Google Scholar 

  21. Malan, A., Pretorius, L., Pretorius, J.: A Framework for Increasing Project Maturity and Capability in Southern Africa. In: PICMET 2007 Proceedings (2007)

    Google Scholar 

  22. McFeeley, R.: IDEAL: A User’s Guide for Software Process Improvement. Software Engineering Institute. Carnegie Mellon University (1996)

    Google Scholar 

  23. Miller, K.: Case Study: Simulation of the Call Center Environment for comparing competing call routing technologies for Business Case ROI Projection (1999)

    Google Scholar 

  24. Murugappan, M., Keeni, G.: Blending CMM and Six Sigma to Meet Business Goals. IEEE SOFTWARE (2003)

    Google Scholar 

  25. Niazi, M., Wilson, D., Zowghi, D.: A maturity model for the implementation of SPI. The Journal of Systems and Software 74, 155–172 (2003)

    Article  Google Scholar 

  26. Niazi, M., Wilson, D., Zowghi, D.: A framework for assisting the design of effective software process improvement implementation strategies. Journal of Systems and Software 78(2), 204–222 (2005)

    Article  Google Scholar 

  27. Li, J., Ruhe, G.: Decision Support Analysis for Software Effort Estimation by Analogy. In: Workshop on Predicto Models in Software Engineering (PROMISE 2007). IEEE, Los Alamitos (2007)

    Google Scholar 

  28. Pan, Z., Park, H., Baik, J., Choi, H.: A Six Sigma Framework for Software Process Improvements and its Implementation. In: Software Engineering Conference. IEEE, Los Alamitos (2007)

    Google Scholar 

  29. Park, R.E., Wolfhart, B., Geothert, W., Florac, A.: Goal-driven Software Measurement, software engineering institute, handbook CMU/SEI-96-HB-002 (1996)

    Google Scholar 

  30. PMI: A Guide to the Project Management Body of Knowledge, 2000 Edition and Third Edition, 2004. Newtown Square: Project Management Institute, USA (2000 & 2004)

    Google Scholar 

  31. Sivi, J., Penn, M., Harper, E.: Relationships Between CMMI and Six Sigma. Software Engineering Institute, Carnegie Mellon University (2005)

    Google Scholar 

  32. Rehessar, H.: Project Management Success Factors. University New South Wales (1996)

    Google Scholar 

  33. Zahran, S.: Business and cost justification of software process improvement (2000)

    Google Scholar 

  34. Zhang, H., Kitchenham, B., Jeffery, R.: Planning Software Project Success with SemiQuantitative Reasoning. In: Proceedings of the 2007 Australian Software Engineering Conference (ASWEC 2007). IEEE, Los Alamitos (2007)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Rory V. O’Connor Nathan Baddoo Kari Smolander Richard Messnarz

Rights and permissions

Reprints and permissions

Copyright information

© 2008 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Landaeta, J.F., García, J., Amescua, A. (2008). Practical SPI Planning. In: O’Connor, R.V., Baddoo, N., Smolander, K., Messnarz, R. (eds) Software Process Improvement. EuroSPI 2008. Communications in Computer and Information Science, vol 16. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-85936-9_8

Download citation

  • DOI: https://doi.org/10.1007/978-3-540-85936-9_8

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-85934-5

  • Online ISBN: 978-3-540-85936-9

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics