This study investigated whether a 4D model can help project participants of construction sites to detect possible errors in construction process. Identifying problems in work sequence and elements are possible when necessary measures are implemented to rectify the problems in advance using a 4D model. The common problem associated with a construction project is a time-space conflict which may lead to project delays and cost overrun. Construction space management and activity sequencing are important aspects for timely project completion within an estimated budget. This research explored the effective use of 4D visualization that could help overcome timespace problems. In order to fulfill this research goal, a 4D model was developed that incorporated spatial requirements along a chronological schedule of events. The model produced logical evidence that a 4D model could effectively be usedin a construction site to detect time-space conflicts.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Kamat, V.R., Martinez, J.C.: 3D Visualization of Construction Processes and Products. In: Proceedings of CIT2000 - The CIB-W78, IABSE, EG-SEA-AI International Conference on Construction Information Technology, Reykjavik, Iceland, pp. 506–512 (2000)
McKinney, K., Fischer, M.: Generating, Evaluating and Visualizing Construction Schedules with CAD tools. Automation in Construction 7(6), 433–447 (1998)
Akbas, R.: 4D Modeling and Product Model Transformations in Experience Music Project (1998), http://www.stanford.edu/group/4D/4D-home.html (Paper retrieved on November 20, 2005)
Akinci, B., Fischer, M., Levitt, R., Carlson, B.: Formalization and Automation of Time-Space Conflict Analysis. J. of Computing in Civil Engineering 6(2), 124–135 (2002)
Haque, M.E., Mishra, R.: 5D Virtual Constructions: Designer/Constructor’s Perspective. In: Proceedings of the 10th International Conference on Computer and Information Technology (ICCIT 2007), Dhaka, Bangladesh, December 27-29 (2007)
Koo, B., Fischer, M.: Feasibility Study of 4D CAD in Commercial Construction. J. Construction Engineering and Management. 126(4), 251–260 (2000)
Griffis, F.H., Sturts, C.S.: Fully integrated and automated project process (FIAPP) for the project manager and executive. In: 4D CAD and Visualization in construction: Developments and Applications, pp. 55–73 (2003)
Kam, C., Fischer, M., Hanninen, R., Karjalainen, A., Laitinen, J.: The product model and fourth dimension project. ITcon, Vol. 8, Special issue IFC – Product models for the AEC arena (2003), http://www.itcon.org/cgi-bin/works/Show?2003_12
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Haque, M.E., Rahman, M. (2009). Time-Space-Activity Conflict Detection Using 4D Visualization in Multi-storied Construction Project. In: Badioze Zaman, H., Robinson, P., Petrou, M., Olivier, P., Schröder, H., Shih, T.K. (eds) Visual Informatics: Bridging Research and Practice. IVIC 2009. Lecture Notes in Computer Science, vol 5857. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-05036-7_26
Download citation
DOI: https://doi.org/10.1007/978-3-642-05036-7_26
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-05035-0
Online ISBN: 978-3-642-05036-7
eBook Packages: Computer ScienceComputer Science (R0)