Abstract
Development of information system project is one of the IT projects which have been developed to offer the best facilities for publics. Process of system development will go through its own life cycle and every process must be refined in order to fulfill aims and objectives. Eventhough information system development is always correlate with failure but a few key factors will help the systems to succeed. There are multiple success factors being discussed by other researches in the information system development but failure figure still at the higher side. The main purpose of this research is to discuss processes involved in the development of information system which positively contribute towards its success. Model of information system development which has been developed (PADM Model) consists of four fundamental processes; planning, requirement analysis, design and maintenance. All processes will be monitored by a main process namely quality as the key performance indicator. Quality plays a vital role in assessing the ability of information system developed in order to fulfill users’ expectations. Analysis of theory can be used as a guideline and measurement base towards the system with hope that percentage of failure will reduce subsequently.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Munford, E., Hirschheim, R., Fitzgerald, G., Wood Harper, T.: Research method in Information System. In: Proc. IFIP WG 8.2 Colloquium (1984)
Laudon, K.C.: Management Information System. Prentice-Hall, Englewood Cliffs (2001)
Standish Group Report, Failure record (1995), http://www.cs.nmt.edu/~cs328/reading/Standish
Dahlberg, T., Jarvinen, J.: Challenges to Information System Qulity. Information and Software Technology 39, 808–818
Von Hellens, L.A.: Information Quality vs software quality: a discussion from a managerial, an organizational and engineering view point. Information and software Technology 39, 801–808
Yeo, K.T.: Critical failure factors in information system projects. International Journal of Project Management 20, 241–246 (2002)
Glen, L.: Understanding information technology system project failure. Dublin Institute of Technology (2004)
Ozkan, S.: Process Based Information System Success Model. In: European Conference on Information System, Spin (2006)
Bruce, R.: Goverment information system problems and failure: a preliminary review (1997), http://www.pamij.com/roche.html
Al Neimat Taimour, T.: Why IT project Fail. The project prefect white paper collection (2005)
Coley Consulting. Reducing your acceptance testing risk: Why project fail (2005), http://www.coleyconsulting.co.uk/failure.htm
Kwenku, E.M.: Critical issues in abandoned information systems development projects. Communication of the ACM 40(9) (1997)
Sauer, C.: Why information system fail: a case study approach. Information system series. UK (1993)
Goulielmos, M.: Outlining organisatinal failure in information system development. Disaster Development and Management Journal 12(4), 319–327 (2002)
Lyytinen, K., Hirschheim, R.: Information failure- a survey and classification of the empirical literature. Oxford survey in Information Technology, 257–309 (1997)
Lemon, F.W.: Information system project failure: a comparative study of two countries. Journal of Global Information Management (2002)
Robert, F.: Project success and failure: what is success, what is failure and how can you improve your odds for success? (2003), http://www.umsl.edu/~sauterv/analysis/6840_f03_papers/frese
Martin, B.: The Brampton factor: Why big government IT projects fail (2008), http://www.silicon.com/publicsector/0,3800010403,39169765,00.htm
Warne, L.: Conflict as a factor in Information System failure. In: The 8th Australasian Conference on Information System, ACIS 1997 (1997); Warne, L.: Conflict and politics of information system failure: a challenge of information system professionals and researchers. In: Defense Science and Technology Organization, pp. 104–134 (1997)
Dewan, K.: Dewan Bahasa dan Pustaka (2005)
Shamsul, S., Mohammad, S., Masarat, A.: Combining ITIL, COBIT and ISO/IEC 27002 in order to design a comprehensive IT framework in organization. In: Second Asia International Conference on Modelling & Simulation (2008)
Rodney, A.S.: A framework for the life cycle management of information technology projects: Project IT. International Journal of Information Management 26, 203–212 (2008)
Gary, P., Shan, L.P.: Examining the coalition dynamics affecting IS project abandoment decision-making. Decision Support System 42, 639–655 (2006)
Gary, P., Ray, H., Shan, L.P.: Information system implementation failure: Insight from prism. International Journal of Information Management 28, 259–269 (2008)
Taylor, J.: Managing Information Technology Projects: Applying Project Management Strategies to Software, Hardware and Integration Initiatives. American Management Association, New York (2003)
Sheila, W.: Failed IT project ( The human factor). Degree dissertation, University of Maryland Bowie State University (1998)
Munns, A.K., Bjeirmi, B.F.: The role of project management in achieving project success. International journal of project management 12(2), 81–87 (1996)
Lynn, C., Julien, P.: Hard and soft project: a framework for analysis. International Journal of Project Management 22, 645–653 (2004)
Rowe, G., Wright, G.: The impact of task characteristics on the performance of structured group forecasting techniques. International Journal of Forecasting (12), 73–89 (1999)
29. T. Robert, Futrell, F. Donald, Shafer, I. Linda, Shafer, Quality Software Project Management. Prentice Hall, (2002)
Barry, W.: A spiral model software development and enhancement. TRW Defence System Groups, 001162/X8/0500-0061-88 IEEE (1988)
Dominik, V., Mladen, V.: Bad practice in complex IT project. In: Proceeding of the IT 30th International Conference of IT Interface (2008)
Ram, C.: Software testing best practices. Technical Report RC 21457 Log 968564/26/99, Center os software enginnering, IBM (1999)
Drucker, P.F.: Management: Tasks, Responsibilities, Practices, The Best of Business Books, The World Executive’s Digest Library, p. 13 (1989)
Kerlinger, F.N.: Foundation of behaviour research, UK (1986)
Maria, Esperanza: Approach to the integration on qilitative and quantitative method in software engineering. Philisophiocal Foundations on Information Systems Engineering (2006)
Nitin, A., Urvashi, R.: Defining success for software projects: An exploratory revelation. International Journal of Project Management 24, 358–370 (2006)
Wateridge, J.: IT project: A basic for success. International Journal of Project Management 13(3), 169–172 (1993)
Whittaker, B.: What went wrong? Unsuccessful information technology project. Information Management & Computer Security 7(1), 23–29 (1999)
Gore, V.: Failure rate: Statistics over IT project failure rate (2005), http://www.it-cortex.com/Stat_Failure_Rate.htm
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Nayan, N.M., Badioze Zaman, H. (2009). Information System Development Model: Theories Analysis and Guidelines. In: Badioze Zaman, H., Robinson, P., Petrou, M., Olivier, P., Schröder, H., Shih, T.K. (eds) Visual Informatics: Bridging Research and Practice. IVIC 2009. Lecture Notes in Computer Science, vol 5857. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-05036-7_85
Download citation
DOI: https://doi.org/10.1007/978-3-642-05036-7_85
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-05035-0
Online ISBN: 978-3-642-05036-7
eBook Packages: Computer ScienceComputer Science (R0)