A Branch-and-Price Algorithm for Multi-mode Resource Leveling

  • Conference paper

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 6049))

Abstract

Resource leveling is a variant of resource-constrained project scheduling in which a non-regular objective function, the resource availability cost, is to be minimized. We present a branch-and-price approach together with a new heuristic to solve the more general turnaround scheduling problem. Besides precedence and resource constraints, also availability periods and multiple modes per job have to be taken into account. Time-indexed mixed integer programming formulations for similar problems quite often fail already on instances with only 30 jobs, depending on the network complexity and the total freedom of arranging jobs. A reason is the typically very weak linear programming relaxation. In particular for larger instances, our approach gives tighter bounds, enabling us to optimally solve instances with 50 multi-mode jobs.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Achterberg, T.: SCIP: solving constraint integer programs. Math. Programming Computation 1(1), 1–41 (2009)

    Article  MATH  MathSciNet  Google Scholar 

  2. Bianco, L., Caramia, M.: A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations. Computers and Operations Research (in press, 2009)

    Google Scholar 

  3. Brucker, P., Drexl, A., Möhring, R., Neumann, K., Pesch, E.: Resource-constrained project scheduling: Notation, classification, models, and methods. European J. Oper. Res. 112, 3–41 (1999)

    Article  MATH  Google Scholar 

  4. Brucker, P., Knust, S.: A linear programming and constraint propagation-based lower bound for the RCPSP. European J. Oper. Res. 127(2), 355–362 (2000)

    Article  MATH  Google Scholar 

  5. Demeulemeester, E.: Minimizing resource availability costs in time-limited project networks. Management Sci. 41, 1590–1598 (1995)

    Article  MATH  Google Scholar 

  6. Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling: A Research Handbook. Kluwer, Dordrecht (2002)

    MATH  Google Scholar 

  7. Drexl, A., Kimms, A.: Optimization guided lower and upper bounds for the resource investment problem. The Journal of the Operational Research Society 52(3), 340–351 (2001)

    Article  MATH  Google Scholar 

  8. Desrosiers, J., Lübbecke, M.E.: A primer in column generation. In: Desaulniers, G., Desrosiers, J., Solomon, M.M. (eds.) Column Generation, pp. 1–32. Springer, Berlin (2005)

    Chapter  Google Scholar 

  9. Franck, B., Neumann, K., Schwindt, C.: Project scheduling with calendars. OR Spektrum 23, 325–334 (2001)

    Article  MATH  MathSciNet  Google Scholar 

  10. Hartmann, S.: Project scheduling with multiple modes: A genetic algorithm. Ann. Oper. Res. 102(1-4), 111–135 (2001)

    Article  MATH  MathSciNet  Google Scholar 

  11. Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. European J. Oper. Res. (in press, 2009)

    Google Scholar 

  12. Megow, N., Möhring, R.H., Schulz, J.: Decision support and optimization in shutdown and turnaround scheduling. INFORMS J. Computing (2010) (fourthcoming)

    Google Scholar 

  13. Möhring, R.H.: Minimizing costs of resource requirements in project networks subject to a fixed completion time. Oper. Res. 32(1), 89–120 (1984)

    Article  MATH  Google Scholar 

  14. Mercier, L., Van Hentenryck, P.: Edge finding for cumulative scheduling. INFORMS J. Computing 20(1), 143–153 (2008)

    Article  MathSciNet  Google Scholar 

  15. Neumann, K., Schwindt, C., Zimmermann, J.: Project scheduling with time windows and scarce resources. Springer, Heidelberg (2003)

    MATH  Google Scholar 

  16. Project Scheduling Problem LIBrary, http://129.187.106.231/psplib/ (last accessed 2010/02/01)

  17. Pritsker, A.A.B., Watters, L.J., Wolfe, P.M.: Multi project scheduling with limited resources: A zero-one programming approach. Management Sci. 16, 93–108 (1969)

    Article  Google Scholar 

  18. Solving Constraint Integer Programs, http://scip.zib.de/

  19. Zhan, J.: Calendarization of time planning in MPM networks. ZOR – Methods and Models for Oper. Res. 36(5), 423–438 (1992)

    Article  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Coughlan, E.T., Lübbecke, M.E., Schulz, J. (2010). A Branch-and-Price Algorithm for Multi-mode Resource Leveling. In: Festa, P. (eds) Experimental Algorithms. SEA 2010. Lecture Notes in Computer Science, vol 6049. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-13193-6_20

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-13193-6_20

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-13192-9

  • Online ISBN: 978-3-642-13193-6

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics