Abstract
This paper considers the coordinated production and delivery scheduling problem. We have a planning horizon consisting of z delivery times each with a unique delivery capacity. Suppose we have a set of jobs each with a committed delivery time, processing time, production window, and profit. The company can earn the profit if the job is produced in its production window and delivered before its committed delivery time. From the company point of view, we are interested in picking a subset of jobs to process and deliver so as to maximize the total profit subject to the delivery capacity constraint. We consider both the single delivery time case and the multiple delivery times case.
Suppose the given set of jobs are k-disjoint, that is, the jobs can be partitioned into k lists of jobs such that the jobs in each list have disjoint production windows. When k is a constant, we developed a PTAS for the single delivery case. For multiple delivery times case, we also develop a PTAS when the number of delivery times is a constant as well.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Amstrong, R., Gao, S., Lei, L.: A zero-inventory production and distribution problem with a fixed customer sequence. Ann. Oper. Res. 159, 395–414 (2008)
Bilgen, B., Ozkarahan, I.: Strategic tactical and operational production-distribution models: A review. Internat. J. Tech. Management 28, 151–171 (2004)
Chen, Z.-L.: Integrated production and distribution operations: Taxonomy, models, and review. In: Simchi-Levi, D., Wu, S.D., Shen, Z.-J. (eds.) Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era. Kluwer Academic Publishers, Norwell (2004)
Chen, Z.-L.: Integrated production and outbound distribution scheduling: Review and extensions. In: Operations Research (2009) (to appear)
Erenguc, S.S., Simpson, N.C., Vakharia, A.J.: Integrated production/ distribution planning in supply chains: An invited review. Eur. J. Oper. Res. 115, 219–236 (1999)
Garcia, J.M., Lozano, S.: Production and delivery scheduling problem with time windows. Computers & Industrial Engineering 48, 733–742 (2005)
Goetschalckx, M., Vidal, C.J., Dogan, K.: Modeling and design of global logistics systems: A review of integrated strategic and tactical models and design algorithms. Eur. J. Oper. Res. 143, 1–18 (2002)
Huo, Y., Leung, J.Y.-T., Wang, X.: Integrated Production and Delivery Scheduling with disjoint windows. Discrete Applied Math. (2009) (to appear)
Kroon, L.G., Salomon, M., Van Wassenhove, L.N.: Exact and approximation algorithms for the operational fixed interval scheduling problem. Eur. J. Oper. Res. 82, 190–205 (1995)
Sarmiento, A.M., Nagi, R.: A review of integrated analysis of production-distribution systems. IIE Trans. 31, 1061–1074 (1999)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2010 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Fu, B., Huo, Y., Zhao, H. (2010). Coordinated Scheduling of Production and Delivery with Production Window and Delivery Capacity Constraints. In: Chen, B. (eds) Algorithmic Aspects in Information and Management. AAIM 2010. Lecture Notes in Computer Science, vol 6124. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-14355-7_15
Download citation
DOI: https://doi.org/10.1007/978-3-642-14355-7_15
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-14354-0
Online ISBN: 978-3-642-14355-7
eBook Packages: Computer ScienceComputer Science (R0)