Abstract
Our project addresses the question how to automatically and simultaneously assign staff to workstations and generate optimised working time models on the basis of fluctuating personnel demand while taking into account practical constraints. Two fundamentally different solution approaches, a specialized constructive heuristic (commercial) and a hybrid metaheuristic (the evolution strategy) that integrates a repair heuristic to remove contraint violations are compared on a complex real-world problem from a retailer. The hybrid approach clearly outperforms the tailored constructive method. Taken together with our similar findings on a related staff scheduling problem from logistics this result suggests that the evolution strategy, despite its original focus on continuous parameter optimisation, is a powerful tool in combinatorial optimisation and deserves more attention. Moreover, hybridising a metaheuristic with a problem-specific repair heuristic seems a useful approach of resolving the conflict between domain-specific characteristics of a real-world problem and the desire to employ generic optimisation techniques, at least in the domain of workforce management.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Beyer, H.-G., Schwefel, H.-P.: Evolution strategies: A comprehensive introduction. Nat. Comp. 1, 3–52 (2002)
Castillo, I., Joro, T., Li, Y.Y.: Workforce scheduling with multiple objectives. EJOR 196, 162–170 (2009)
Cheang, B., Li, H., Lim, A., Rodrigues, B.: Nurse rostering problems – a bibliographic survey. EJOR 151(3), 447–460 (2003)
Ernst, A.T., Jiang, H., Krishnamoorthy, M., Owens, B., Sier, D.: An annotated biblography of personnel scheduling and rostering. Annals of OR 127, 21–144 (2002)
Ernst, A.T., Jiang, H., Krishnamoorthy, M., Sier, D.: Staff scheduling and rostering: A review of applications, methods and models. EJOR 153(1), 3–27 (2004)
Fowler, J.W., Wirojanagud, P., Gel, E.S.: Heuristics for workforce planning with worker differences. EJOR 190(3), 724–740 (2008)
Garey, M.R., Johnson, D.S.: Computers and Intractability. A Guide to the Theory of NP-Completeness. Freeman, New York (1979)
Günther, M.: Hochflexibles Workforce Management. PhD dissertation. Ilmedia (2011) (to appear)
Günther, M., Nissen, V.: Sub-daily staff scheduling for a logistics service provider. KI 24(2), 105–113 (2010)
Hare, D.R.: Staff scheduling with ilog solver. Technical report, Okanagan University College (2007)
TU Ilmenau. Test data sub-daily staff scheduling (2010), http://www.tu-ilmenau.de/wid/forschung/testprobleme-personaleinsatzplanung
Kabak, Ö., Ülengin, F., Akta, E., Önsel, S., Topcu, Y.I.: Efficient shift scheduling in the retail sector through two-stage optimization. EJOR 184(1), 76–90 (2008)
Lesaint, D., Voudouris, C., Azarmi, N., Alletson, I., Laithwaite, B.: Field workforce scheduling. BT Technology Journal 21(4), 23–26 (2003)
Melachrinoudis, E., Min, H.: The hybrid queuing and bi-objective integer programming model for scheduling frontline employees in a retail organisation. Int. J. of Services Techn. and Management 9(1), 33–50 (2008)
Mohan, S.: Scheduling part-time personnel with availability restrictions and preferences to maximize employee satisfaction. Math. and Comp. Model. 48(11), 1806–1813 (2008)
Nissen, V., Gold, S.: Survivable network design with an evolution strategy. In: Yang, A., Shan, Y., Bui, L.T. (eds.) Success in Evolutionary Computation. SCI, pp. 263–283. Springer, Heidelberg (2008)
Pastor, R., Olivella, J.: Selecting and adapting weekly work schedules with working time accounts. EJOR 184(1), 1–12 (2008)
Pinedo, M.: Planning and Scheduling in Manufacturing and Service. Springer Series in Operations Research. Springer, New York (2005)
Prüm, H.: Entwicklung von Algorithmen zur Personaleinsatzplanung mittels ganzzahliger linearer Optimierung. Master thesis. FH Trier (2006)
Rudolph, G.: An evolutionary algorithm for integer programming. In: Davidor, Y., Schwefel, H.-P., Männer, R. (eds.) PPSN 1994. LNCS, vol. 866, pp. 139–148. Springer, Heidelberg (1994)
Sauer, J., Schumann, R.: Modelling and solving workforce scheduling problems. In: Sauer, J., Edelkamp, S., Schattenberg, B. (eds.) 21. Workshop PUK, Osnabrück, pp. 93–101 (2007)
Schumann, R., Sauer, J.: Implications and consequences of mass customization on manufacturing control. In: Blecker, T., Edwards, K., Friedrich, G., Salvador, F. (eds.) Innovative Processes and Products for Mass Customization, Hamburg, GITO, pp. 365–378 (2007)
Tien, J., Kamiyama, A.: On manpower scheduling algorithms. SIAM Rev. 24(3), 275–287 (1982)
Valls, V., Perez, A., Quintanilla, S.: Skilled workforce scheduling in service centres. EJOR 193(3), 791–804 (2009)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2011 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Nissen, V., Günther, M., Schumann, R. (2011). Integrated Generation of Working Time Models and Staff Schedules in Workforce Management. In: Di Chio, C., et al. Applications of Evolutionary Computation. EvoApplications 2011. Lecture Notes in Computer Science, vol 6625. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-20520-0_50
Download citation
DOI: https://doi.org/10.1007/978-3-642-20520-0_50
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-20519-4
Online ISBN: 978-3-642-20520-0
eBook Packages: Computer ScienceComputer Science (R0)