Abstract
The manual selection and assignment of appropriate cables to the interconnections between the devices of a substation automation system is a major cost factor in substation automation system design. This paper discusses about the modeling of the substation automation system cable planning as an integer linear optimization problem to generate an efficient cable plan for substation automation systems.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Brand, K.-P., et al.: Substation Automation Handbook. Utility Automation Consulting (2003)
Achterberg, T.: SCIP: Solving Constraint Integer Programs. J. Math. Prog. Comp. 1(1), 1–41 (2009)
Achterberg, T.: Constraint Integer Programming, Technische Universität Berlin (2007)
SCIP Mixed Integer Programming Solver, http://zibopt.zib.de
CLP Linear Programming Solver, https://projects.coin-or.org/Clp
CPLEX Optimizer, http://www-01.ibm.com/software/integration/optimization/cplex-optimizer
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2011 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Sivanthi, T., Poland, J. (2011). Efficient Planning of Substation Automation System Cables. In: Achterberg, T., Beck, J.C. (eds) Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems. CPAIOR 2011. Lecture Notes in Computer Science, vol 6697. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-21311-3_20
Download citation
DOI: https://doi.org/10.1007/978-3-642-21311-3_20
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-21310-6
Online ISBN: 978-3-642-21311-3
eBook Packages: Computer ScienceComputer Science (R0)