Skip to main content

A Multi-period Stochastic Production Planning and Sourcing Problem with Discrete Demand Distribution

  • Conference paper
Advances in Swarm Intelligence (ICSI 2011)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 6729))

Included in the following conference series:

  • 2012 Accesses

Abstract

This paper studies a new class of multi-period stochastic production planning and sourcing problem with minimum risk criteria, in which a manufacturer has a number of plants or subcontractors and has to meet the product demands according to the service levels set by its customers. In the proposed problem, demands are characterized by stochastic variables with known probability distributions. The objective of the problem is to minimize the probability that the total cost exceeds a predetermined maximum allowable cost, where the total cost includes the sum of the inventory holding, setup and production costs in the planning horizon. For general demand distributions, the proposed problem is very complex, so we cannot solve it by conventional optimization methods. To avoid this difficulty, we assume the demands have finite discrete distributions, and derive the crisp equivalent forms of both probability objective function and the probability level constraints. As a consequence, we turn the original stochastic production planning problem into its equivalent integer programming one so that the branch-and-bound method can be used to solve it. Finally, to demonstrate the developed modeling idea, we perform some numerical experiments via one 3-product source, 8-period production planning problem.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Candea, D., Hax, A.C.: Production and Inventory Management. Prentice-Hall, New Jersey (1984)

    Google Scholar 

  2. Das, S.K., Subhash, C.S.: Integrated Approach to Solving the Master Aggregate Scheduling Problem. Int. J. Prod. Econ. 32(2), 167–178 (1994)

    Article  Google Scholar 

  3. Dzielinski, B.P., Gomory, R.E.: Optimal Programming of Lot Sizes, Inventory and Labor Allocations. Manag. Sci. 11, 874–890 (1965)

    Article  MathSciNet  Google Scholar 

  4. Florian, M., Klein, M.: Deterministic Production Planning with Concave Costs and Capacity Constraints. Manag. Sci. 18, 12–20 (1971)

    Article  MathSciNet  MATH  Google Scholar 

  5. Lasdon, L.S., Terjung, R.C.: An Efficient Algirithm for Multi-Echelon Scheduling. Oper. Res. 19, 946–969 (1971)

    Article  MATH  Google Scholar 

  6. Bitran, G.R., Yanasee, H.H.: Deterministic Approximations to Stochastic Production Problems. Oper. Res. 32(5), 999–1018 (1984)

    Article  MathSciNet  MATH  Google Scholar 

  7. Zäfel, G.: Production Planning in the Case of Uncertain Individual Demand Extension for an MRP II Concept. Int. J. Prod. Econ. 119, 153–164 (1996)

    Article  Google Scholar 

  8. Kelly, P., Clendenen, G., Dardeau, P.: Economic Lot Scheduling Heuristic for Random Demand. Int. J. Prod. Econ. 35(1-3), 337–342 (1994)

    Article  Google Scholar 

  9. Lan, Y., Liu, Y., Sun, G.: Modeling Fuzzy Multi-Period Production Planning and Sourcing Problem with Credibility Service Levels. J. Comput. Appl. Math. 231(1), 208–221 (2009)

    Article  MathSciNet  MATH  Google Scholar 

  10. Lan, Y., Liu, Y., Sun, G.: An Approximation-Based Approach for Fuzzy Multi-Period Production Planning Problem with Credibility Objective. Appl. Math. Model. 34(11), 3202–3215 (2010)

    Article  MathSciNet  MATH  Google Scholar 

  11. Sun, G., Liu, Y., Lan, Y.: Optimizing Material Procurement Planning Problem by Two-Stage Fuzzy Programming. Comput. Ind. Eng. 58(1), 97–107 (2010)

    Article  Google Scholar 

  12. Sun, G., Liu, Y., Lan, Y.: Fuzzy Two-Stage Material Procurement Planning Problem. J. Intell. Manuf. 22(2), 319–331 (2011)

    Article  Google Scholar 

  13. Yıldırım, I., Tan, B., Karaesmen, F.: A Multiperiod Stochastic Production Planning and Sourcing Problem with Service Level Constraints. OR Spectrum 27(2-3), 471–489 (2005)

    Article  MathSciNet  MATH  Google Scholar 

  14. Nemhauser, G.L., Wolsey, L.A.: Integer and Combinatorial Optimization. John Wiley & Sons, New York (1988)

    Book  MATH  Google Scholar 

  15. Wolsey, L.A.: Integer Programming. John Wiley & Sons, New York (1998)

    MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Chen, W., Liu, Y., Wu, X. (2011). A Multi-period Stochastic Production Planning and Sourcing Problem with Discrete Demand Distribution. In: Tan, Y., Shi, Y., Chai, Y., Wang, G. (eds) Advances in Swarm Intelligence. ICSI 2011. Lecture Notes in Computer Science, vol 6729. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-21524-7_20

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-21524-7_20

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-21523-0

  • Online ISBN: 978-3-642-21524-7

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics