Abstract
Jack-up wind-power installation vessel is the most important tool in construction of wind farm. And the control system for hydraulic lifting platform is the key point of jack-up wind-power installation vessel. Therefore the design of the control system for hydraulic lifting platform with jack-up wind-power installation vessel is a basic and formidable problem. This article provides an integrated solution to the design of control system. Firstly, on the base of actual working condition, we introduce the control principle and basic requirements of the hydraulic lifting platform, such as the structure of leg, vessel gradient, alarm, calibration. Secondly we introduce the design solution of PLC (Programmable Logic Controller) control system, which includes the design solution of hardware as well as software for the hydraulic control system. In this part, we introduce the basic components and main function of hydraulic control system, hardware scheme, software design project. Then we introduce a good human-machine interface. Finally we do the work of program design according to the process of lifting unit. By using wincc-flexible and PLCSIM, we can layout the control module well and realize the man-machine interaction. At last, we can obtain a viable hydraulic control system and verify feasibility of the hydraulic control system by simulation software. At the same time, we obtain the working parameters of the lifting unit from the simulation.
Keywords
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Zhan, Y., Zhang, X.: PLC Control of Pin Climbing-rod Hydraulic Self-lift Ocean Oil Boring Platform. Machine Tool & Hydraulics (2000)
Zhao, Y.-N., Hao, J.: Current Situation and Development Trend of the Legs of the Self-elevating Offshore Wind Power Installation Vessels. Marine Engineering (2010)
Li, W.-H., Zhang, Y.-D.: Analysis of the Hydraulic Elevating Systems of the Self-elevating Offshore Platform. Chinese Hydraulics & Pneumatics (2006)
Liu, H., He, W.: PLC Programming and application of Siemens S7-300/400. China Machine Press, Beijing (2011)
Che, C.: The Hydraulic and Control System’s Design of The Bolt Climb Rod Wind Power Installation Vessel’s Lifting Devices. Wuhan University of Technology, Wuhan (2012)
Zhou, K., Chen, B., Feng, Y.: Hydraulic Synchronous Lift System. Machine Tool & Hydraulics (2007)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Yang, X., Chen, D., Dong, M., Li, T. (2013). Design of Control System for Hydraulic Lifting Platform with Jack-Up Wind-Power Installation Vessel. In: Zu, Q., Hu, B., Elçi, A. (eds) Pervasive Computing and the Networked World. ICPCA/SWS 2012. Lecture Notes in Computer Science, vol 7719. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-37015-1_62
Download citation
DOI: https://doi.org/10.1007/978-3-642-37015-1_62
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-37014-4
Online ISBN: 978-3-642-37015-1
eBook Packages: Computer ScienceComputer Science (R0)