A Proposal for the Improvement Predictability of Cost Using Earned Value Management and Quality Data

  • Conference paper
Systems, Software and Services Process Improvement (EuroSPI 2013)

Part of the book series: Communications in Computer and Information Science ((CCIS,volume 364))

Included in the following conference series:

Abstract

Although the Earned Value Management – EVM technique is utilized by several companies in different sectors for over 35 years, in order to predict cost results, many studies detected vulnerabilities in the technique, among them: (i) there is instability in the cost and time performance indicators during the Project; (ii) there is a trend of deterioration in the cost and time indicators when the projects are near their end, and others. The present study proposes an extension of this technique, through the integration of the history of quality performance data as means of improving the technique’s cost predictability. The proposed technique is evaluated and compared to the traditional technique through different hypothesis tests, utilizing data from the simulation projects. The technique was more accurate and more precise than the traditional EVM for the calculation of the Cost Performance Index – CPI and the Estimate At Completion – EAC.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. PMI, Project Management Body of Knowledge-PMBOK Newton Square, PMI (2013)

    Google Scholar 

  2. Zwikael, O., et al.: Evaluation of Models for Forecasting the Final Cost of a Project. Project Management Journal 31(1), 53–57 (2000)

    Google Scholar 

  3. SEI, S.E.I., CMMI® for Development, V1.3, CMU/SEI-2010-TR-033, SEI (2010)

    Google Scholar 

  4. Henderson, K., Zwikael, O.: Does Project Performance Stability Exist A Re-examination of CPI and Evaluation of SPI(t) Stability. Cross Talk 21 (2008)

    Google Scholar 

  5. Christensen, D., Heise, S.R.: Cost Performance Index Stability. National Contract Management Journal 25, 7–15 (1993)

    Google Scholar 

  6. Vandevoorde, S., Vanhoucke, M.: A comparison of different project duration forecasting methods using earned value metrics. Project Management Journal 24, 289–302 (2006)

    Article  Google Scholar 

  7. Souza, A.D., Rocha, A.R.C.: A proposal for the improvement of the technique of Earned Value Management utilizing the history of performance data. In: Proceedings of the Twenty-Fourth International Conference on Software Engineering & Knowledge Engineering - SEKE, pp. 753–759 (2012a)

    Google Scholar 

  8. Souza, A.D., Rocha, A.R.C.: A proposal for the improvement the predictability of project cost using EVM and Historical Data of Cost. In: 35th International Conference of Software Engineering-ICSE. ACM SRC, San Francisco (accepted February 2013b)

    Google Scholar 

  9. Florac, W.A., Carleton, A.D.: Measuring the Software Process: Statistical Process Control for Software Process Improvement. Addison-Wesley (1999)

    Google Scholar 

  10. Iranmanesh, H., Mojir, N., Kimiagari, S.: A new formula to “Estimate At Completion” of a Project’s time to improve “Earned value management system”. International Journal of Project Management (2007)

    Google Scholar 

  11. Souza, A.D., Rocha, A.R.C.: A proposal for the improvement of the technique of EVM utilizing the history of performance data. In: Proceedings of the Twenty-Fourth SEKE, pp. A3–A4 (2012b)

    Google Scholar 

  12. Lipke, W.: Independent Estimates at Completion – Another Method. Cross Talk The Journal of Defense Software Engineering 17(10), 32 (2004)

    Google Scholar 

  13. Putnam, L.H.: Five Core Metrics: The Intelligence Behind Successful Software Management. Dorset House (2003)

    Google Scholar 

  14. Wöhlin, C., Runeson, P., Höst, M., Ohlsson, M.C., Regnell, B., Wessl, A.: Experimentation in software engineering: an introduction. Springer (2012)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

de Souza, A.D., Rocha, A.R.C. (2013). A Proposal for the Improvement Predictability of Cost Using Earned Value Management and Quality Data. In: McCaffery, F., O’Connor, R.V., Messnarz, R. (eds) Systems, Software and Services Process Improvement. EuroSPI 2013. Communications in Computer and Information Science, vol 364. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-39179-8_17

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-39179-8_17

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-39178-1

  • Online ISBN: 978-3-642-39179-8

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics