Abstract
Integration in Manufacturing which allows to make more efficient the plant operation through a rationalised automation involving not only the control but also the maintenance and the technical management islands, is not yet the reality despite the increasing of Information Technology capabilities. Indeed the industrial ways of thinking are changing slowly because they require standardised solutions and rationalised engineering process to move from automation hierarchical architectures to automation distributed ones.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Capetta L., Galara D., Graefer J., Lovischek G.P., Mondeil L., Sanguineti M. From current Actuators and transmitters towards Intelligent Actuation and Measurement PRIAM Approach, Proceedings of Automation-BIAS, pp 1171–1186, Milan, Italy, November 23–25, 1993.
Leger J.B., Iung B., Ferro De Beca, Pinoteau J., A new approach of Distributed Maintenance System: the REMAFEX way of Working, Proceedings of ASI97 (ICIMS-NOE EP III-9251), Budapest, Hungary, July 14–17, 1997.
Galara D., Russo F., Morel G., Iung B., Update on the European state of the art of Intelligent field devices, Proceedings of the International Conference on Intelligent Systems in Process Engineering, pp 339–342, SnowMass, USA, AIChE Symposium Series, Volume 92, 1996.
Iung B, Petin J.F., Morel G., Development and Integration of Intelligent Actuator in a Manufacturing System, Proceedings of ICAM’93, pp 191–196, Tokyo, Japan, 08–1993.
Morel G., Iung B., Galara D., Russo F., Prototyping a sub-concept of Computer Integrated Manufacturing Engineering (CIME): the integrated Control,Maintenance and Technical Management System (CMMS), International Journal on Intelligent Actuation and Soft Computing - Trends in R&D and Applications, TSI Press Series, Vol.2, pp 2530, ISBN 0–96274551-5–4
Proceedings of the workshop on Process Modelling for Enterprise Integration with CIMOSA. Workshop organised by the CIMOSA association. University of technology in Loughborough, Leics./UK, March 1996.
Proceedings of the VOICE OPEN WORKSHOP, Berlin (Germany), 14–09-1993.
Goranson H.T., EI Capability Model, WS2WGlreport (see Part I of this Volume)
Paulk M.C., How ISO 9001 compares with the CMM,IEEE Software, pp 74–83, 01–1995
Neunrether E., Iung B.., Morel G., Leger J.B., Engineering process modelling of an Intelligent Actuation and Measurement System: from users’ needs definition to the implementation, Proceedings of IMS’97, pp 69–74, SEOUL, July 21–23, 1997.
Petin J.F., Mery D., Panetto H., Iung B., Validation of software components for Intelligent Actuation and Measurement, Proceedings of the 6`h International Symposium on Robotics and Manufacturing (ISRAM’96), World Automation Congress, Special Session “Innovative Automation Engineering”, Montpellier (France), May 27–30, 1996.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1997 ECSC-EC-EAEC, Brussels-Luxembourg
About this chapter
Cite this chapter
Morel, G., Iung, B. (1997). Balancing Between Integration and Distribution Paradigms: The Modelling Process of the European CMMS—IAMS Projects. In: Kosanke, K., Nell, J.G. (eds) Enterprise Engineering and Integration. Research Reports Esprit. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-60889-6_37
Download citation
DOI: https://doi.org/10.1007/978-3-642-60889-6_37
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-63402-7
Online ISBN: 978-3-642-60889-6
eBook Packages: Springer Book Archive