Three stage generalized flowshop: Scheduling civil engineering projects

  • Published:
Journal of Global Optimization Aims and scope Submit manuscript

Abstract

We model the working of a civil engineering firm concerned with land development as a three stage flexible flowshop with weak chain precedence constraints and where preemption is allowed. The scheduling objective is to minimize the total tardiness for all the projects. Since solving this problem optimally is very hard, we propose a number of heuristic scheduling procedures which are evaluated extensively on real-life data and artificial problem instances.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Blazewicz, J., Eiselt, H., Finke, G., Laporte, G., and Weglarz, J. (1991). “Scheduling jobs and vehicles in flexible manufacturing systems”, The International Journal of FMS, 4, 5–16.

    Google Scholar 

  • Blazewicz, J., Ecker, K., Schmidt, G., and Weglarz, J., (1993). Scheduling in Computer and Manufacturing Systems. Springer-Verlag, Berlin 1993.

    Google Scholar 

  • Blazewicz, J., Dror, M., Pawlak, G., and Stecke, K.E., (1994). “A note on flexible flowshop scheduling with two-stages”, Foundation of Computing and Decision Science 19, 159–172.

    Google Scholar 

  • Dell'Olmo, P., Dror, M., and Kubiak, W., (1993). “‘Strong’-‘Weak’ Chain Constrained Scheduling.” working paper. MIS dept., University of Arizona.

  • Emmons, H. (1969). “One-machine sequencing to minimize certain functions of job tardiness. Operations Research, 17, 701–715.

    Google Scholar 

  • Garey, M.R., Johnson, D.S., and Sethi, R., (1976). “The complexity of flowshop and jobhop scheduling”, Mathematics of Operations Research, 117–129.

  • Hefetz, N. and Adiri, I., (1982). “A note on the influence of missing operations on scheduling problems”, Naval Research Logistics Quarterly 29, 535–539.

    Google Scholar 

  • Jackson, J.R. (1955). “Scheduling a production line to minimize maximum tardiness”, Research Report 43, Management Science Research Project, University of California, Los Angeles.

    Google Scholar 

  • Kouvelis, P. and Vairaktarakis, G.L., (1994). “A two stage flexible job shop scheduling problem”, Operations Research Letters, (in press).

  • Law, Averill M. and Kelton, David W. (1991). “Simulation Modeling & Analysis”, cond Edition, McGraw-Hill, Inc. New York.

    Google Scholar 

  • Sriskandarajah, C. and Sethi, S.P., (1989). “Scheduling algorithms for flexible flowshops: Worst and average case performance”, EJOR. 43, 143–160.

    Google Scholar 

  • Wittrock, R.J., (1988). “An adaptable scheduling algorithm for flexible flow lines”, Operations Research, 36, 445–453.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Dror, M., Mullaseril, P.A. Three stage generalized flowshop: Scheduling civil engineering projects. J Glob Optim 9, 321–344 (1996). https://doi.org/10.1007/BF00121677

Download citation

  • Accepted:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00121677

Keywords

Navigation