Open shop problems with unit time operations

  • Published:
Zeitschrift für Operations Research Aims and scope Submit manuscript

Abstract

We show that them-machine open shop problem in which all operations have unit processing times can be polynomially transformed to a special preemptive scheduling problem onm identical parallel machines. Many results published recently as well as some new results are derived by using this transformation. The new results include solutions of open problems mentioned in a recent paper by Kubiak et al. p]A similar relationship is derived between no-wait open shop problems with unit time operations andm-machine problems with jobs having unit processing times.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • Bräsel H (1990) Lateinische Rechtecke und Maschinenbelegung, Dissertation B, TU Magdeburg

  • Bräsel H, Kluge D, Werner F (1991) A polynomial algorithm for then¦m¦O¦t ij =1;tree¦C max problem, to appear in EJOR

  • Bräsel H, Kluge D, Werner F (1991a) A polynomial algorithm for an open shop problem with unit processing times and tree constraints, Preprint, Technische Universität Otto von Guericke, Magdeburg

    Google Scholar 

  • Bräsel H, Kluge D, Werner F (1992) A polynomial time algorithm for a 2-machine open shop problem with precedence constraints and unit processing times, Preprint, Technische Universität Otto von Guericke, Magdeburg

    Google Scholar 

  • Brucker P, Garey MR, Johnson DS (1977) Scheduling equal-length tasks under treelike precedence constrains to minimize maximum lateness. Math. Oper. Res. 2:275–284

    Google Scholar 

  • Coffman EG, Graham RL (1972) Optimal Scheduling for two-processor systems. Acta Informatika 1:200–213

    Google Scholar 

  • Gabow HN, Kariv O (1982) Algorithms for edge coloring bipartite graphs and multigraphs. SIAM J. Comput. 11:117–129

    Google Scholar 

  • Garey MR, Johnson DS (1976) Scheduling tasks with nonuniform deadlines on two processors. J. Assoc. Comput. Mach. 23:461–467

    Google Scholar 

  • Garey MR, Johnson DS (1977) Two-processor scheduling with start-times and deadlines. SIAM J. Comput. 6:416–426

    Google Scholar 

  • Gonzalez T (1982) Unit execution time shop problems. Math. Oper. Res. 7:57–66

    Google Scholar 

  • Gonzalez T, Johnson DS (1980) A new algorithm for preemptive scheduling of trees. J. Assoc. Comput. Mach. 27:287–312

    Google Scholar 

  • Graham RE, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discrete Math. 5:287–326

    Google Scholar 

  • Horn WA (1974) Some simple scheduling algorithms. Naval Res. Logist. Quart. 21:177–185

    Google Scholar 

  • Hu TC (1961) Parallel sequencing and assembly line problems. Oper. Res. 9:841–848

    Google Scholar 

  • Jackson JR (1955) Scheduling a production line to minimize maximum tardiness, Research Report 43, Management Science Research Project, University of California, Los Angeles

    Google Scholar 

  • Karp RM (1972) Reducibility among combinatorial problems. In: R.E. Miller, J.W. Thatcher, Complexity of Computer Computations, Plenum Press, New York, pp. 85–103

    Google Scholar 

  • Kubiak W, Sriskandarajah C, Zaras K (1991) A note on the complexity of openshop scheduling problems. INFOR 29:284–294

    Google Scholar 

  • Labetoulle J, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1984) Preemptive scheduling of uniform machines subject to release dates. In: WR Pulleyblank (ed.), Progress in combinatorial optimization, Academic Press, New York, pp. 245–261

    Google Scholar 

  • Lawler EL (1976) Sequencing to minimize the weighted number of tardy jobs. RAIRO Rech. Opér. 10:5 Suppl. 27–33

    Google Scholar 

  • Lawler EL (1982) Preemptive scheduling of precedence-constrained jobs on parallel machines. In: MAH Dempster, JK Lenstra, AHG Rinnooy Kan, Deterministic and stochastic scheduling, Reidel, Dordrecht, pp. 101–123

    Google Scholar 

  • Lenstra JK, Rinnooy Kan AHG (1978) Complexity of scheduling under precedence constraints. Oper. Res. 26:22–35

    Google Scholar 

  • Liu CY, Bulfin RL (1988) Scheduling open shops with unit execution times to minimize functions of due dates. Oper. Res. 36:553–559

    Google Scholar 

  • McNaughton R (1959) Scheduling with deadlines and loss functions. Management Sci. 6:1–12

    Google Scholar 

  • Monma CL (1979) The two machine maximum flow-time with series parallel precedence constraints: an algorithm and extensions. Oper. Res. 25:792–798

    Google Scholar 

  • Muntz RR, Coffman EG (1969) Optimal preemptive scheduling on two processor systems. IEEE Trans. Computers C-18:1014–1020

    Google Scholar 

  • Muntz RR, Coffman EG (1970) Preemptive scheduling of real time tasks on multiprocessor systems. J. Assoc. Comput. Mach. 17:324–338

    Google Scholar 

  • Sethi R (1976) Algorithms for minimal length schedules. In: JR Coffman, Computer and job-shop scheduling theory. Wiley, New York, pp. 51–99

    Google Scholar 

  • Papadimitriou CH, Steiglitz K (1982) Combinatorial optimization, Algorithms and complexity, Prentice-Hall

  • Simons B, Warmuth MK (1989) A fast algorithm for multiprocessor scheduling of unit length jobs. SIAM J. Comput., to appear

  • Tanaev VS, Sotskov YN, Strusewich VA (1989) Theory of scheduling-multistage systems, Moscow, Nauka (in Russian)

    Google Scholar 

  • Tautenhahn T (1991) Minimizing maximal lateness for open shop witht ij =1 and release times, Preprint, Technische Universität, Magdeburg

    Google Scholar 

  • Ullman JD (1975) NP-Complete scheduling problems. J. Comput. System Sci. 10:384–393

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

This work was supported by Deutsche Forschungsgemeinschaft (Project JoPTAG).

Rights and permissions

Reprints and permissions

About this article

Cite this article

Brucker, P., Jurisch, B. & Jurisch, M. Open shop problems with unit time operations. ZOR - Methods and Models of Operations Research 37, 59–73 (1993). https://doi.org/10.1007/BF01415528

Download citation

  • Received:

  • Revised:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01415528

Key Words

Navigation