Algorithms for single-machine scheduling with stochastic outtree precedence relations to minimize expected weighted flow time or maximum expected lateness

  • Articles
  • Published:
Zeitschrift für Operations Research Aims and scope Submit manuscript

Abstract

Stochastic single-machine scheduling problems with special tree-like GERT precedence constraints and expected weighted flow time or maximum expected lateness as objective functions are considered. To obtain polynomial algorithms for these problems, Smith's ratio rule and Lawler's rule for the deterministic problems 1¦outtree¦Σw v C v and 1¦prec¦f max , respectively, are generalized.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Bruno FL (1976) Scheduling algorithms for minimizing the mean weighted flow-time criterion. In Coffman EG Jr (ed) Computer and Job-Shop Scheduling Theory. John Wiley & Sons New York 101–137

    Google Scholar 

  • Bücker M (1990) Ein-Maschinen-Scheduling-Probleme mit stochastischen Reihenfolgebeziehungen unter besonderer Berücksichtigung polynomialer Algorithmen. Doctoral Dissertation, University of Karlsruhe

  • Bücker M (1992) Time complexity of single-machine scheduling with stochastic precedence constraints. Zeitschrift für Operations Research 36:211–226

    Google Scholar 

  • Bücker M, Neumann K (1989) Stochastic single-machine scheduling to minimize the weighted expected flow-time and maximum expected lateness subject to precedence constraints given by an OR Network. Report WIOR-361, Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe

  • Cinlar E (1975) Introduction to stochastic processes. Prentice-Hall, Englewood Cliffs

    Google Scholar 

  • Elmaghraby SE (1977) Activity networks: Project planning and control by network models. John Wiley & Sons New York

    Google Scholar 

  • Graham RL, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: A Survey. Annals of Discrete Mathematics 5:287–326

    Google Scholar 

  • Horn WA (1972) Single-machine job sequencing with treelike precedence ordering and linear delay penalties. SIAM Journal of Applied Mathematics 23:189–202

    Google Scholar 

  • Lawler EL (1973) Optimal sequencing of a single machine subject to precedence constraints. Management Science 19:544–546

    Google Scholar 

  • Lawler EL (1976) Combinatorial optimization: Networks and matroids. Holt, Rinehart and Winston New York

    Google Scholar 

  • Lenstra JK, Rinnooy Kan AHG (1978) Complexity of scheduling under precedence constraints. Operations Research 26:22–35

    Google Scholar 

  • Lenstra JK, Rinnooy Kan AHG, Brucker P (1977) Complexity of machine scheduling problems. Annals of Discrete Mathematics 1:343–362

    Google Scholar 

  • Neumann K (1984) Recent developments in stochastic activity networks. Canadian Journal of Operational Research and Information Processing 22:219–248

    Google Scholar 

  • Neumann K (1985) EOR project networks. Computing 34:1–15

    Google Scholar 

  • Neumann K (1990) Stochastic project networks. Lecture Notes in Economics and Mathematical Systems Vol 344. Springer Berlin

    Google Scholar 

  • Neumann K, Steinhardt U (1979) GERT networks and the time-oriented evaluation of projects. Lecture Notes in Economics and Mathematical Systems Vol 172 Springer Berlin

    Google Scholar 

  • Nicolai W (1980) On the temporal analysis of special GERT networks using a modified Markov renewal process. Zeitschrift für Operations Research 24:263–272

    Google Scholar 

  • Pritsker AAB (1977) Modeling and analysis usingQ-GERT networks. John Wiley & Sons New York

    Google Scholar 

  • Pritsker AAB, Sigal CE (1983) Management decision making — A network simulation approach. Prentice Hall, Englewood Cliffs

    Google Scholar 

  • Rubach T (1984) Stochastische Reihenfolgeplanung mit Hilfe von GERT-Netzplänen. Doctoral Dissertation. University of Karlsruhe

  • Smith WE (1956) Various optimizers for single-stage production. Naval Research Logistics Quarterly 3:59–66

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bücker, M., Neumann, K. & Rubach, T. Algorithms for single-machine scheduling with stochastic outtree precedence relations to minimize expected weighted flow time or maximum expected lateness. ZOR - Methods and Models of Operations Research 39, 321–348 (1994). https://doi.org/10.1007/BF01435461

Download citation

  • Received:

  • Revised:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01435461

Key words

Navigation