Skip to main content
Log in

Preventive maintenance scheduling of power generating units

  • Applications In Production And Scheduling
  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

The problem of preventive maintenance planning of electric power generating units can be formulated as a mixed-integer linear optimization problem. An extension of the model is presented to deal with more realistic assumptions about utilization of power resource. We propose a heuristic iterative exchange procedure to solve these problems. We introduce two methods to prevent jamming situations outside the feasible domain or at a local optimum. The first method is a recursive exchange procedure called multiple exchanges method and the second relies on Lagrangian relaxation. Furthermore, we compare these procedures with a tabu search.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. J. Aubin, Une approche heuristique pour la confection d'horaires de Cégep, Master Thesis, Département d'Informatique et de Recherche Opérationnelle, Université de Montréal (1985).

  2. G. Côté and L. Lafond, Planification à long terme des entretiens d'équipements de production: lère partie — Présentation du problème et modélisation proposée, Rapport IREQ-2647 (1982).

  3. G. Côté and L. Lafond, Planification à long terme des entretiens d'équipements de production: 2ieme partie — Description d'une formulation mathématique et d'une méthode de résolution basée sur une approche de réseau généralisé, Rapport IREQ-2735 (1983).

  4. J.A. Ferland and M. Florian, A sub-optimal algorithm to solve a large scale 0–1 programming problem,Proc. 9th Int. Mathematical Programming Symp., Budapest (1976) pp. 23–27.

  5. J.A. Ferland and A. Lavoie, Exchange procedures for timetabling problems, Discr. Appl. Math. 35(1992)237–253.

    Article  Google Scholar 

  6. M.L. Fisher, An application oriented guide to Lagrangian relaxation, Interfaces 15(1985)10–21.

    Google Scholar 

  7. C. Fleurent, Méthodes heuristiques pour la conception de calendriers sportifs, Master Thesis, Département d'Informatique et de Recherche Opérationnelle, Université de Montréal (1987).

  8. F. Glover, Tabu search, CAAI Report 88-3 (1988).

  9. F. Glover, J. Hultz and D. Klingman, Improved computer-based planning techniques: Part II, Interfaces 9(1979)12–20.

    Google Scholar 

  10. M.H. Held, P. Wolfe and H.D. Crowder, Validation of subgradient optimization, Math. Progr. 6(1974)62–88.

    Article  Google Scholar 

  11. T.D. Klastorin, An effective subgradient algorithm for the generalized assignment problem, Comp. Oper. Res. 6(1979)155–164.

    Article  Google Scholar 

  12. B.L. Kralj and R. Petrović, Optimal preventive maintenance scheduling of thermal generating units in power systems — A survey of problem formulations and solution methods, Comp. Oper. Res. 6(1979)155–164.

    Article  Google Scholar 

  13. A. Kusiak and S.S. Heragu, Expert systems and optimization, IEEE Trans. Software Eng. SE-8(1989)1017–1020.

    Article  Google Scholar 

  14. A. Lavoie, Méthodes d'échanges pour problèmes d'affectation, Master Thesis, Département d'Informatique et de Recherche Opérationnelle, Université de Montréal (1989).

  15. J.B. Mazzola and A.W. Neebe, Resource-constrainted assignment scheduling, Oper. Res. 34(1986)560–572.

    Article  MathSciNet  Google Scholar 

  16. G.T. Ross and R.M. Soland, A branch and bound algorithm for the generalised assignment problem, Math. Progr. 8(1975)91–103.

    Article  Google Scholar 

  17. S. Roy, Problème d'affectation généralisée avec conflits: application au problème de confection d'horaires de cours, Master Thesis, Département d'Informatique et de Recherche Opérationnelle, Université de Montréal (1982).

Download references

Author information

Authors and Affiliations

Authors

Additional information

This research was supported by NSERC (Grant A8312) and FCAR (Grant ER-0289).

Michèle Charest had an NSERC Scholarship to work on this project.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Charest, M., Ferland, J.A. Preventive maintenance scheduling of power generating units. Ann Oper Res 41, 185–206 (1993). https://doi.org/10.1007/BF02023074

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02023074

Keywords

Navigation