Skip to main content
Log in

Implizite Determinierung von Plan-Belegungszeiten

Implicit Determination of Standard Times

  • WI — Aufsatz
  • Published:
Wirtschaftsinformatik

Abstract

Correct standard times are needed for logistic operating curves, manufacturing planning and control systems and Advanced Planning Systems (APS) for scheduling, lot-sizing and sequencing. This paper presents a model for calculation of standard times based on the knowledge of the total busy time of a work center and the produced number of items in a fixed time period. The developed method requires little effort in comparison to other methods such as Work-Factor or time observation. It can regularly determine standard times using current confirmation data.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literatur

  1. Althaler, J.; Jodlbauer, H.; Reitner, S.: Wirtschaftsmathematik, Fallstudie zur Beherrschung unternehmerischer Komplexität. Ennsthaler, Steyr 2004.

    Google Scholar 

  2. Engl, H. W.; Hanke, M.; Neubauer, A.: Regularization of Inverse Problems. Kluwer Academic Publishers, Dordrecht 2000.

    Google Scholar 

  3. Fandel, G.; François, P.; Gubitz, K.-M.: PPS- und integrierte betriebliche Softwaresysteme. Springer, Berlin 1997.

    Book  Google Scholar 

  4. Goldratt, E.: The Haystack Syndrome. North River Press, Great Barrington 1990.

    Google Scholar 

  5. Haller-Wedel, E.: Das Multimoment-Verfahren in Theorie und Praxis. Statische Verfahren für Arbeitsstudien, Prüf- und Messtechnik. Band 2, Hanser, München 1969.

    Google Scholar 

  6. Hopp, W. J.; Spearman, M. L.: Factory Physics. Foundations of Manufacturing Management. Irwin, New York 1996.

    Google Scholar 

  7. Little, J. D. C.: A proof of the Queuing Formula L = λW. In: Operations Research 9 (1961), S. 383–387.

    Google Scholar 

  8. Luczak, H.: Arbeitswissenschaft. Springer, Berlin 1998.

    Google Scholar 

  9. Jodlbauer, H.: Discussion of the standard processing time. In: International Journal of Production Research 42 (2004) 7, S. 1471–1479.

    Google Scholar 

  10. Jodlbauer, H.: Definition and properties of the input-weighted average lead-time. In: European Journal of Operational Research 164 (2005) 2, S. 354–357.

    Google Scholar 

  11. Meyr, H.; Rohde, J.; Schneeweiss, L.; Wagner, Michael: Architecture of Selected APS. In: Stadtler, H.; Kilger, C. (Hrsg.): Supply Chain Management and Advanced Planning. Springer, Berlin 2002.

    Google Scholar 

  12. Meyr, H.; Wagner, M.; Rohde, J.: Structure of Advanced Planning. In: Stadtler, H.; Kilger, C. (Hrsg.): Supply Chain Management and Advanced Planning. Springer, Berlin 2002.

    Google Scholar 

  13. Neumaier, A.: Solving-ill-conditioned and singular linear systems: A tutorial on regularization. In: SIAM Review 40 (1998) 3, S. 636–666.

    Google Scholar 

  14. Nyhuis, P.; Wiendahl, H. P.: Logistische Kennlinien, Grundlagen, Werkzeuge und Anwendungen. Springer, Berlin 1999.

    Google Scholar 

  15. Quick, J. H.; Duncan, J. H.; Malcom, J. A. jr.: Work Factor Time Standards. Measurement of Manual and Mental Work. Mc Graw-Hill, New York 1962.

    Google Scholar 

  16. REFA, Verband für Arbeitsstudien und Betriebsorganisation e.V.: Methodenlehre des Arbeitsstudiums. Teil 2: Datenermittlung. Hanser, München 1992.

    Google Scholar 

  17. SAP AG (Hrsg): Funktionen im Detail — Produktionsplanung. Walldorf 1996.

    Google Scholar 

  18. Steven, M.; Krüger, R.: Advanced Planning Systems - Grundlagen, Funktionalitäten, Anwendungen. In: Busch, A.; Dangelmaier, W. (Hrsg.): Integriertes Supply Chain Management. Gabler, Wiesbaden, 2004.

    Google Scholar 

  19. Vollmann, T. E.; Berry, W. L.; Whybark, D. C.: Manufacturing Planning and Control Systems. Mc Graw-Hill, Boston 1997.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Jodlbauer, H., Palmetshofer, K. & Reitner, S. Implizite Determinierung von Plan-Belegungszeiten. Wirtschaftsinf 47, 101–108 (2005). https://doi.org/10.1007/BF03250982

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF03250982

Keywords

Navigation