Skip to main content

Resource allocation and scheduling in metasystems

  • Workshop: Distributed Computing and Metacomputing
  • Conference paper
  • First Online:
Book cover High-Performance Computing and Networking (HPCN-Europe 1999)

Part of the book series: Lecture Notes in Computer Science ((LNCS,volume 1593))

Included in the following conference series:

Abstract

In this paper we present NWIRE, a new management architecture for metacomputing systems. After the general introduction of the architecture we first describe the properties that are relevant for scheduling. Then we derive general requirements for scheduling strategies in metasystems and point out differences to conventional job scheduling for parallel processors. This leads to the metacomputing scheduling concept of NWIRE which is based on a brokerage and trading approach.

Supported by the NRW Metacomputing grant

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. D.G. Feitelson, L. Rudolph, U. Schwiegelshohn, K.C. Sevcik, and P. Wong. Theory and practice in parallel job scheduling. In D.G. Feitelson and L. Rudolph, editors, IPPS'97 Workshop: Job Scheduling Strategies for Parallel Processing, pages 1–34. Springer-Verlag, Lecture Notes in Computer Science LNCS 1291, 1997.

    Google Scholar 

  2. I. Foster and C. Kesselman. Globus: A metacomputing infrastructure toolkit. International Journal of Supercomputer Application, 11(2):115–128, 1997.

    Article  Google Scholar 

  3. R.N. Lagerstrom and S.K. Gipp. PscheD: Political Scheduling on the CRAY T3E. In D.G. Feitelson and L. Rudolph, editors, IPPS'97 Workshop: Job Scheduling Strategies for Parallel Processing, pages 117–138. Springer-Verlag, Lecture Notes in Computer Science LNCS 1291, 1997.

    Google Scholar 

  4. P. Tucker and F. Berman. On market mechanisms as a software technique. Technical Report CS96-513, University of California—San Diego, Department of Computer Science and Engineering, December 1996.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Peter Sloot Marian Bubak Alfons Hoekstra Bob Hertzberger

Rights and permissions

Reprints and permissions

Copyright information

© 1999 Springer-Verlag

About this paper

Cite this paper

Schwiegelshohn, U., Yahyapour, R. (1999). Resource allocation and scheduling in metasystems. In: Sloot, P., Bubak, M., Hoekstra, A., Hertzberger, B. (eds) High-Performance Computing and Networking. HPCN-Europe 1999. Lecture Notes in Computer Science, vol 1593. Springer, Berlin, Heidelberg . https://doi.org/10.1007/BFb0100645

Download citation

  • DOI: https://doi.org/10.1007/BFb0100645

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-65821-4

  • Online ISBN: 978-3-540-48933-7

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics