Skip to main content
Log in

Makespan estimation and order acceptance in batch process industries when processing times are uncertain

  • Special Issue Paper
  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract.

Batch process industries are characterized by complex precedence relationships between operations, which renders the estimation of an acceptable workload very difficult. A detailed schedule based model can be used for this purpose, but for large problems this may require a prohibitive large amount of computation time. We propose a regression based model to estimate the makespan of a set of jobs. We extend earlier work based on deterministic processing times by considering Erlang-distributed processing times in our model. This regression-based model is used to support customer order acceptance. Three order acceptance policies are compared by means of simulation experiments: a scheduling policy, a workload policy and a regression policy. The results indicate that the performance of the regression policy can compete with the performance of the scheduling policy in situations with high variety in the job mix and high uncertainty in the processing times.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Correspondence to: C.V. Ivanescu

Rights and permissions

Reprints and permissions

About this article

Cite this article

Ivanescu, C., Fransoo, J. & Bertrand, J. Makespan estimation and order acceptance in batch process industries when processing times are uncertain. OR Spectrum 24, 467–495 (2002). https://doi.org/10.1007/s00291-002-0108-0

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-002-0108-0

Navigation