Skip to main content
Log in

Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna

  • cigre 2010
  • Published:
e & i Elektrotechnik und Informationstechnik Aims and scope Submit manuscript

Summary

30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Resuming literature

  • Resolución sobre las Modificaciones a la Metodología para la Determinación de los Cargos por Servicio de Transmisión de Energía Eléctrica. Diario Oficial de la Federación. Jueves, 23 de Diciembre de 1999

  • Secretaría de Energía (2002): Prospectiva del Sector Eléctrico 2002–2011. Mexico

  • Seppa, T. (2003): Fried Wire? Public Utilities Fortnightly, December 2003: 39–41

  • WG SC 22-12 CIGRE (1992): The thermal behaviour of overhead conductors, Section 1 and 2, Mathematical model for evaluation of conductor temperature in the steady state and the application thereof. Electra, 144: 107–125

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Svejda, G., Vavra, J., Bechis, M. et al. Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna. Elektrotech. Inftech. 127, 344–349 (2010). https://doi.org/10.1007/s00502-010-0789-z

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00502-010-0789-z

Keywords

Navigation