Summary
30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.
Similar content being viewed by others
Resuming literature
Resolución sobre las Modificaciones a la Metodología para la Determinación de los Cargos por Servicio de Transmisión de Energía Eléctrica. Diario Oficial de la Federación. Jueves, 23 de Diciembre de 1999
Secretaría de Energía (2002): Prospectiva del Sector Eléctrico 2002–2011. Mexico
Seppa, T. (2003): Fried Wire? Public Utilities Fortnightly, December 2003: 39–41
WG SC 22-12 CIGRE (1992): The thermal behaviour of overhead conductors, Section 1 and 2, Mathematical model for evaluation of conductor temperature in the steady state and the application thereof. Electra, 144: 107–125
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Svejda, G., Vavra, J., Bechis, M. et al. Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna. Elektrotech. Inftech. 127, 344–349 (2010). https://doi.org/10.1007/s00502-010-0789-z
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00502-010-0789-z