Skip to main content

Advertisement

Log in

On the polyhedral structure of a multi–item production planning model with setup times

  • Published:
Mathematical Programming Submit manuscript

Abstract.

 We present and study a mixed integer programming model that arises as a substructure in many industrial applications. This model generalizes a number of structured MIP models previously studied, and it provides a relaxation of various capacitated production planning problems and other fixed charge network flow problems. We analyze the polyhedral structure of the convex hull of this model, as well as of a strengthened LP relaxation. Among other results, we present valid inequalities that induce facets of the convex hull under certain conditions. We also discuss how to strengthen these inequalities by using known results for lifting valid inequalities for 0–1 continuous knapsack problems.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Received: 30 October 2000 / Accepted: 25 March 2002 Published online: September 27, 2002

Key words. mixed integer programming – production planning – polyhedral combinatorics – capacitated lot–sizing – fixed charge network flow

Some of the results of this paper have appeared in condensed form in ``Facets, algorithms, and polyhedral characterizations of a multi-item production planning model with setup times'', Proceedings of the Eighth Annual IPCO conference, pp. 318-332, by the same authors.

This paper presents research results of the Belgian Program on Interuniversity Poles of Attraction initiated by the Belgian State, Prime Minister's Office, Science Policy Programming. The scientific responsibility is assumed by the authors.

This research was also supported by NSF Grant No. DMI-9700285 and by Philips Electronics North America.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Miller, A., Nemhauser, G. & Savelsbergh, M. On the polyhedral structure of a multi–item production planning model with setup times. Math. Program., Ser. B 94, 375–405 (2003). https://doi.org/10.1007/s10107-002-0325-y

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10107-002-0325-y

Keywords

Navigation