Abstract
This paper investigates the optimal threshold values of age to perform preventive maintenance (PM) actions for leased equipment within the lease period. In this paper, we use age reduction method to describe the degree of PM and construct the maintenance cost function. For repairable leased equipment, two maintenance models are proposed: (i) maintenance policy of single-phase and (ii) maintenance policy of two-phase. During the lease period, PM actions are carried out when the age of equipment reaches a certain threshold value. Any failure of the leased equipment is rectified by a minimal repair within the lease period. Under these maintenance schemes, the mathematical models of the expected total cost for maintenance policies of single-phase and two-phase are established, and the optimal maintenance policies are derived such that the expected total cost is minimized. Finally, the features of the optimal maintenance policy are illustrated through numerical examples.
Similar content being viewed by others
References
Barlow, R. E., & Hunter, L. C. (1960). Optimum preventive maintenance policies. Operations Research, 8, 90–100.
Block, H. W., Borges, W. S., & Savits, T. H. (1985). Age dependent minimal repair. Journal of Applied Probability, 22, 370–385.
Blischke, W. R. (1990). Mathematical models for analysis of warranty policies. Mathematical and Computer Modelling, 13, 1–16.
Brown, M., & Proschan, F. (1983). Imperfect repair. Journal of Applied Probability, 20, 851–859.
Glickman, T. S., & Berger, P. D. (1976). Optimal price and protection period decisions for a product under a warranty. Management Science, 22, 1381–1390.
Jack, N., & Dagpunar, J. S. (1994). An optimal imperfect maintenance policy over a warranty period. Microelectronics and Reliability, 34, 529–534.
Jaturonnatee, J., Murthy, D. N. P., & Boondiskulchok, R. (2006). Optimal preventive maintenance of leased equipment with corrective minimal repairs. European Journal of Operational Research, 174, 201–215.
Nakagawa, T. (1979). Imperfect preventive-maintenance. Journal of the Operations Research Society of Japan, 24, 213–227.
Nguyen, D. G., & Murthy, D. N. P. (1988). Optimal reliability allocation for products sold under warranty. Engineering Optimization, 13, 35–45.
Pham, H., & Wang, H. (1996). Imperfect maintenance. European Journal of Operational Research, 94, 425–438.
Pongpech, J., & Murthy, D. N. P. (2006). Optimal periodic preventive maintenance policy for leased equipment. Reliability Engineering & System Safety, 91, 772–777.
Tseng, S. T., Yeh, R. H., & Ho, W. T. (1998). Imperfect maintenance policies for deteriorating production system. International Journal of Production Economics, 55, 191–201.
Yeh, R. H., & Chang, W. L. (2007). Optimal threshold value of failure-rate for leased products with preventive maintenance actions. Mathematical and Computer Modelling, 46, 730–737.
Yeh, R. H., & Lo, H. C. (2001). Optimal preventive-maintenance warranty policy for repairable products. European Journal of Operational Research, 134, 59–69.
Yeh, R. H., Ho, W. T., & Tseng, S. T. (2000). Optimal production run length for products sold with warranty. European Journal of Operational Research, 120, 575–582.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Yeh, R.H., Chang, W.L. & Lo, HC. Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method. Ann Oper Res 181, 171–183 (2010). https://doi.org/10.1007/s10479-010-0713-2
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10479-010-0713-2