Abstract
Production distribution systems are increasingly crucial because of shortened product life cycles, increasing competition, and uncertainty introduced by globalization. Production distribution involves a multistage supply chain network that consists of factories, distribution centers, retailers, and various customers. Customer demands fluctuate and are unpredictable, thereby causing an imprecise customer quantity demand in each period in the production distribution model, and increasing inventory and related costs. Most studies have addressed the production distribution problem with certain demands or a single period. To fill the gap, this study aims to integrate the extended priority-based discrete particle swarm optimization and novel extended priority-based hybrid genetic algorithm for solving flexible multistage production distribution under uncertain demands in multiple periods. In particular, triangular fuzzy demands are considered for minimizing the total cost, including transportation costs, inventory costs, shortage costs, and ordering costs, in the multistage and multi-time-period supply chain. For validation, we designed numerical experiments to compare the proposed approaches with LINGO computational software (for small problems) and conventional genetic algorithms (for normal problems) in real settings. The experimental results demonstrated practical viability of the proposed approaches.
Similar content being viewed by others
References
Chamnanlor, C., Sethanan, K., Chien, C.-F., & Gen, M. (2014). Re-entrant flow shop scheduling problem with time windows using hybrid genetic algorithm based on auto-tuning strategy. International Journal of Production Research, 52(9), 2612–2629.
Chan, F. T. S., Chung, S. H., & Wadhwa, S. (2005). A hybrid genetic algorithm for production and distribution. Omega, 55, 345–355.
Chien, C.-F., Chen, Y.-J., & Peng, J.-T. (2010). Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle. International Journal of Production Economics, 128(2), 496–509.
Chien, C.-F., Chen, J., & Wei, C. (2011). Constructing a comprehensive modular fuzzy ranking framework and illustrations. Journal of Quality, 18(4), 333–350.
Chien, C.-F., Wu, C., & Chiang, Y. (2012). Coordinated capacity migration and expansion planning for semiconductor manufacturing under demand uncertainties. International Journal of Production Economics, 135(2), 860–869.
Chien, C.-F., Wu, J.-Z., & Wu, C.-C. (2013). A two-stage stochastic programming approach for new tape-out allocation decisions for demand fulfillment planning in semiconductor manufacturing. Flexible Services and Manufacturing Journal, 25(3), 286–309.
Chien, C.-F., & Zheng, J.-N. (2012). Mini–max regret strategy for robust capacity expansion decisions in semiconductor manufacturing. Journal of Intelligent Manufacturing, 23(6), 2151–2159.
Chou, C.-W., Chien, C.-F., & Gen, M. (2014). A multiobjective hybrid genetic algorithm for TFT-LCD module assembly scheduling. IEEE Transactions on Automation Science and Engineering, 11(3), 692–705.
Costa, A., Celano, G., Fichera, S., & Trovato, E. (2010). A new efficient encoding/decoding procedure for the design of a supply chain network with genetic algorithms. Computers & Industrial Engineering, 59, 986–999.
Duenas, A., & Petrovic, D. (2008). Multi-objective genetic algorithm for single machine scheduling problem under fuzziness. Fuzzy Optimization and Decision Making, 7(1), 87–104.
Gen, M., & Cheng, R. W. (2000). Genetic algorithm and engineering optimization. New York: Wiley.
Gen, M., Cheng, R., & Lin, L. (2008). Network models and optimization: Multiobjective genetic algorithm approach. London: Springer.
Kennedy, J. & Eberhart, R. (1995). Particle swarm optimization. In Proceeding of the 1998 IEEE international conference on neural network (pp. 1942–1948).
Kumar, B. R. (2012). On fuzzy transportation problem using triangular fuzzy numbers with modified revised simplex method. International Journal of Engineering Science and Technology, 4, 285–294.
Li, X., Chien, C.-F., Yang, L., & Gao, Z. (2014). The train fueling cost minimization problem with fuzzy fuel prices. Flexible Service and Manufacturing Journal, 26, 249–267.
Li, Y., Gen, M. & Ida, K. (1996). Evolutionary computation for multicriteria solid transportation problem with fuzzy numbers. In Proceeding of IEEE international conference on evolutionary computation (pp. 596–601).
Lin, L., Gen, M., & Wang, X. (2009). Integrated multistage logistics network design by using hybrid evolutionary algorithm. Computers & Industrial Engineering, 56, 854–873.
Sethanan, K., Jamrus, T., & Boonthavee, P. (2013). Solving production scheduling of egg production in hen farms with capacity of slaughterhouse by heuristic algorithms. IACSIT International Journal of Engineering and Technology, 5, 50–53.
Shao, X., Liu, W., Liu, Q. & Zhang, C. (2013). Hybrid discrete particle swarm optimization for multi-objective flexible job-shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 67, 2885–2901.
Varthanan, P. A., Murugan, N., & Kumar, G. M. (2013). An AHP based heuristic DPSO algorithm for generating multi criteria production-distribution plan. Journal of Manufacturing Systems, 32, 632–647.
Wang, H. F., & Hsu, H. W. (2012). A possibilistic approach to the modeling and resolution of uncertain closed-loop logistics. Fuzzy Optimization and Decision Making, 11, 177–208.
Xu, J., Liu, Q., & Wang, R. (2008). A class of multi-objective supply chain networks optimal model under random fuzzy environment and its application to the industry of Chinese liquor. Information Sciences, 178, 2022–2043.
Yun, Y., & Gen, M. (2003). Performance analysis of adaptive genetic algorithms with fuzzy logic and heuristics. Fuzzy Optimization and Decision Making, 2, 161–175.
Zeballos, L. J., Mendez, C. A., Barbosa-Povoa, A. P., & Novais, A. Q. (2014). Multi-period design and planning of closed-loop supply chains with uncertain supply and demand. Computers & Chemical Engineering, 66, 151–164.
Acknowledgments
This research is supported by the Ministry of Science and Technology, Taiwan (NSC100-2628-E-007-017-MY3; NSC101-2811-E-007-004; NSC102-2622-E-007-013; NSC102-2811-E-007-005), the Advanced Manufacturing and Service Management Research Center of National Tsing Hua University (102N2075E1), Fuzzy Logic Systems Institute, Japan (JSPS-the Grant-in-Aid for Scientific Research C No. 24510219) and the Faculty of Engineering, Khon Kaen University, Thailand.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Jamrus, T., Chien, CF., Gen, M. et al. Multistage production distribution under uncertain demands with integrated discrete particle swarm optimization and extended priority-based hybrid genetic algorithm. Fuzzy Optim Decis Making 14, 265–287 (2015). https://doi.org/10.1007/s10700-014-9200-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10700-014-9200-6