Skip to main content
Log in

Understanding the outsourcing learning curve: A longitudinal analysis of a large Australian company

  • Published:
Information Systems Frontiers Aims and scope Submit manuscript

Abstract

Outsourcing continues to capture the attention of researchers as more companies move to outsourcing models as part of their business practice. Two areas frequently researched and reported in the literature are the reasons why a company decides to outsource, and outsourcing success factors. This paper describes an in-depth, longitudinal case study that explores both the reasons why the company decided to outsource and factors that impact on success. The paper describes how Alpha, a very large Australian communications company, approached outsourcing and how its approach matured over a period of 9 years. The paper concludes that although a number of reasons are proposed for a company's decision to outsource, lowering costs was the predominant driver in this case. We also describe other factors identified as important for outsourcing success such as how contracts are implemented, the type of outsourcing partner arrangement, and outsourcing vendor capabilities.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Baldwin, L., Irani, Z., & Love, P. (2001). Outsourcing information systems: Drawing lessons from the banking case study. European Journal of Information Systems, 10, 15–24.

    Article  Google Scholar 

  • Barthelemy, J., & Geyer, D. (2004). The determinants of total IT outsourcing: An empirical investigation of French and German firms. The Journal of Computer Information Systems, 44(3), 91–97.

    Google Scholar 

  • Beaumont, M., & Costa, C. (2002). Information technology outsourcing in Australia. Information Resources Management Journal, 15(3), 14–30.

    Google Scholar 

  • Beaumont, N., & Sohal, A. (2004). Outsourcing in Australia. International Journal of Operations and Production Management, 24(7), 688–700.

    Article  Google Scholar 

  • Choudhury, V., & Sabherwal, R. (2003). Portfolios of control in outsourced software development projects. Information Systems Research, 14(3), 291–314.

    Article  Google Scholar 

  • Dibbern, J., Goles, T., Hirschheim, R., & Jayatilaka, B. (2004). Information systems outsourcing: A survey and analysis of the literature. Database, 35(5), 6–102.

    Article  Google Scholar 

  • Diromualdo, A., & Gurbaxani, V. (1998). Strategic intent for IT outsourcing. Sloan Management Review, 39(4), 67–81.

    Google Scholar 

  • Gellings, C., & Wullenweber, K. (2006). Successfully implementing IT outsourcing strategy in German banks: The role of contract design and risk analysis. In ECIS 2006, Gotenberg, Sweden.

  • Gonzalez, R., Gasco, J., & Llopis, J. (2006). Information systems outsourcing: A literature analysis. Information and Management, 43, 821–834.

    Article  Google Scholar 

  • Gottschalk, P., & Solli-Saether, H. (2006). Maturity model for IT outsourcing relationships. Industrial Management and Data Systems, 106(2), 200–212.

    Article  Google Scholar 

  • Ho, V., Ang, S., & Straub, D. (2003). When subordinates become IT contractors: Persistent managerial expectations in IT outsourcing. Information Systems Research, 14(1), 66–125.

    Article  Google Scholar 

  • Kern, T., & Willcocks, L. (2002). Exploring relationships in information technology outsourcing: interaction approach. European Journal of Information Systems, 11, 3–19.

    Article  Google Scholar 

  • King, W. (2004). Outsourcing and the future of IT. Information Systems Management, 21(4), 83–84.

    Article  Google Scholar 

  • King, J. K., & Kraemer, K. (1984). Evolution and organizational information systems: An assessment of Nolan's stage model. Communications of the ACM, 27(5), 466–475.

    Article  Google Scholar 

  • King, W., & Teo, T. (1997). Integration between business planning and information systems planning: Validating a Stage Hypothesis. Decision Sciences, 28(2), 279–308 Spring.

    Article  Google Scholar 

  • Kishore, R., Rao, H., Nam, K., Rajagopalan, S., & Chaudhury, A. (2003). A relationship perspective on IT outsourcing. Communications of the ACM, 46(12), 87–92.

    Article  Google Scholar 

  • Lacity, M., & Hirschheim, R. (1993). The information systems outsourcing bandwagon. Sloan Management Review, 35(1), 73–86.

    Google Scholar 

  • Lacity, M., & Willcocks, L. (2000). Survey of IT outsourcing experiences in US and UK organizations. Journal of Global Information Management, 8(2), 5–23.

    Google Scholar 

  • Lacity, M., Willicocks, L., & Feeny, D. (1996). The value of selective IT sourcing. Sloan Management Review, 37(3), 13–25.

    Google Scholar 

  • Lee, J., Huynh, M., Kwok, R., & Pi, S. (2003). IT outsourcing evolution—past, present and future. Communications of the ACM, 46(5), 84–89.

    Article  Google Scholar 

  • Lee, J., Miranda, S., & Kim, Y. (2004). I. T. outsourcing strategies: Universalistic, contingency, and consideration all explanations of success. Information Systems Research, 15(2), 110–131.

    Article  Google Scholar 

  • Mcfarlan, W., & Nolan, R. (1995). How to manage and I T. Outsourcing alliance. Sloan Management Review, 36(2), 9–23.

    Google Scholar 

  • Neuman, W. L. (2003). Social research methods. Boston: Allyn and Bacon.

    Google Scholar 

  • Nicholson, B., & Sahay, S. (2001). Some political and cultural issues in the globalization of software development: case experience from Britain and Indian. Information and Organization, 11(1), 25–43.

    Article  Google Scholar 

  • Olayele, A., & Wabash, S. (2004). IT outsourcing maturity model. In European Conference on Information Systems. Finland: Turku.

  • Sekaran, U. (1984). Research methods for business. Hoboken: Wiley.

    Google Scholar 

  • Smith, H., & Mckeen, J. (2004). Developments in practice XIV: I. T. sourcing—how far can you go? Communications of the Association for Information Systems, 14, 508–520.

    Google Scholar 

  • Tan, C., & Sia, S. (2006). Managing flexibility in outsourcing. Journal of the Association for Information Systems, 7(4), 179–206.

    Google Scholar 

  • Walsham, G. (1995). Interpretive case studies in IS research: Nature and method. European Journal of Information Systems, 4(2), 74–81.

    Article  Google Scholar 

  • Walsham, G. (2006). Doing interpretive research. European Journal of Information Systems, 15, 320–330.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Julie Fisher.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Fisher, J., Hirschheim, R. & Jacobs, R. Understanding the outsourcing learning curve: A longitudinal analysis of a large Australian company. Inf Syst Front 10, 165–178 (2008). https://doi.org/10.1007/s10796-008-9070-y

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10796-008-9070-y

Keywords

Navigation