Skip to main content

Advertisement

Log in

Hypernetwork-based manufacturing service scheduling for distributed and collaborative manufacturing operations towards smart manufacturing

  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

Abstract

In the future smart manufacturing, both of sensor-based environment in shop floors and cloud-based environment among more and more enterprises are deployed gradually. Various distributed and separated manufacturing facilities are as collaborative cloud services, integrated and aggregated with their real-time information. It provides opportunities for the distributed and collaborative manufacturing operations across lots of distributed but networked enterprises on demand with enough flexibility. To this end, the scheduling problem and its result of those collaborative services for distributed manufacturing operations play an important role in improving manufacturing utilization and efficiency. In this paper, we put forward the hypernetwork-based models introducing the thought of graph coloring and an artificial bee colony algorithm based method for this scheduling problem. Three groups of experiments are carried out respectively to discuss therein different situations of distributed and collaborative manufacturing operations, i.e., in a private cloud, in a public cloud, and in a hybrid cloud. Some future studies with further consideration of collaboration equilibrium, dynamic control and data-based intelligence, are finally pointed out in the conclusion.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

Similar content being viewed by others

References

  • Camarinha-Matos, L. (2009). Collaborative networked organizations: Status and trends in manufacturing. Annual Reviews in Control, 33(2), 199–208.

    Article  Google Scholar 

  • Chen, J., Huang, P., Wu, J., Lai, K., Chen, C., & Peng, T. (2013). Advanced planning and scheduling for TFT-LCD color filter fab with multiple lines. International Journal of Advanced Manufacturing Technology, 67(1–4), 101–110.

    Article  Google Scholar 

  • Cheng, Y., Tao, F., Zhao, D., & Zhang, L. (2017). Modeling of manufacturing service supply-demand matching hypernetwork in service-oriented manufacturing systems. Robotics and Computer-Integrated Manufacturing, 45(SI), 59–72.

    Article  Google Scholar 

  • Ding, K., Jiang, P., Leng, J., & Cao, W. (2016). Modeling and analyzing of an enterprise relationship network in the context of social manufacturing. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 230(4), 752–769.

    Article  Google Scholar 

  • Dotoli, M., Fanti, M., Meloni, C., & Zhou, M. (2006). Design and optimization of integrated e-supply chain for agile and environmentally conscious manufacturing. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans, 36(1), 62–75.

    Article  Google Scholar 

  • Goren, H., Tunali, S., & Jans, R. (2010). A review of applications of genetic algorithms in lot sizing. Journal of Intelligent Manufacturing, 21(4), 575–590.

    Article  Google Scholar 

  • He, J., Chen, X., Chen, X. D., & Liu, Q. (2016). Distributed production planning based on ATC and MOILP considering different coordination patterns. Journal of Intelligent Manufacturing, 27(5), 1067–1084.

    Article  Google Scholar 

  • Hvolby, H., & Setger-Jensen, K. (2010). Technical and industrial issues of advanced planning and scheduling (APS) systems. Computers in Industry, 61(9), 845–851.

    Article  Google Scholar 

  • Kung, L., & Chern, C. (2009). Heuristic factory planning algorithm for advanced planning and scheduling. Computers & Operations Research, 36(9), 2513–2530.

    Article  Google Scholar 

  • Liu, J., Zhu, H., Ma, Q., Zhang, L., & Xu, H. (2015). An artificial bee colony algorithm with guide of global & local optimal and asynchronous scaling factors for numerical optimization. Applied Soft Computing, 37(C), 608–618.

    Article  Google Scholar 

  • Lo Nigro, G., La Diega, S., Perrone, G., & Renna, P. (2003). Coordination policies to support decision making in distributed production planning. Robotics and Computer-Integrated Manufacturing, 19(6), 521–531.

    Article  Google Scholar 

  • Lv, Y., & Lin, D. (2017). Design an intelligent real-time operation planning system in distributed manufacturing network. Industrial Management & Data Systems, 117(4), 742–753.

    Article  Google Scholar 

  • Mishra, N., Singh, A., Kumari, S., Govindan, K., & Ali, S. (2016). Cloud-based multi-agent architecture for effective planning and scheduling of distributed manufacturing. International Journal of Production Research, 54(23), 7115–7128.

    Article  Google Scholar 

  • Moghaddam, M., & Nof, S. (2014). Combined demand and capacity sharing with best matching decisions in enterprise collaboration. International Journal of Production Economics, 148, 93–109.

    Article  Google Scholar 

  • Moo, C., Kim, J., & Gen, M. (2004). Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research, 42(15), 2941–2954.

    Article  Google Scholar 

  • Ozturk, C., & Ornek, M. (2016). Optimisation and constraint based heuristic methods for advanced planning and scheduling systems. International Journal of Industrial Engineering-Theory Applications and Practice, 23(1), 26–48.

    Google Scholar 

  • Peng, Y., Lu, D., & Chen, Y. (2014). A constraint programming method for advanced planning and scheduling system with multilevel structured products. Discrete Dynamics in Nature and Society. https://doi.org/10.1155/2014/917685.

  • Rafiei, H., & Rabbani, M. (2012). Capacity coordination in hybrid make-to-stock/make-to-order production environments. International Journal of Production Research, 50(3), 773–789.

    Article  Google Scholar 

  • Shen, W., Wang, L., & Hao, Q. (2006). Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey. IEEE Transactions on Systems, Man, and Cybernetics-Part T: Applications and Reviews, 36(4), 563–577.

    Article  Google Scholar 

  • Steger-Jensen, K., Hvolby, H., Nielsen, P., & Nielsen, I. (2011). Advanced planning and scheduling technology. Production Planning & Control, 22(8), 800–808.

    Article  Google Scholar 

  • Tao, F., Cheng, Y., Xu, L., Zhang, L., & Li, B. (2014a). CCIoT-CMfg: Cloud computing and internet of things based cloud manufacturing service system. IEEE Transactions on Industrial Informatics, 10(2), 1435–1442.

    Article  Google Scholar 

  • Tao, F., Cheng, Y., Zhang, L., & Nee, A. (2017). Advanced manufacturing systems: Socialization characteristics and trends. Journal of Intelligent Manufacturing, 28(5), 1079–1094.

    Article  Google Scholar 

  • Tao, F., Feng, Y., Zhang, L., & Liao, T. (2014b). CLPS-GA: A case library and Pareto solution-based hybrid genetic algorithm for energy-aware cloud service scheduling. Applied Soft Computing, 19, 264–279.

    Article  Google Scholar 

  • Tao, F., Laili, Y., Xu, L., & Zhang, L. (2013). FC-PACO-RM: A parallel method for service composition optimal-selection in cloud manufacturing system. IEEE Transactions on Industrial Informatics, 9(4), 2023–2033.

    Article  Google Scholar 

  • Tao, F., & Qi, Q. (2017). New IT driven service-oriented smart manufacturing framework and characteristics. IEEE Transactions on Systems, Man and Cybernetics: Systems. https://doi.org/10.1109/TSMC.2017.2723764.

  • Tarantilils, C., Kiranoudis, C., & Theodorakopoulos, N. (2008). A web-based ERP system for business services and supply chain management: Application to real-world process scheduling. European Journal of Operational Research, 187(3), 1310–1326.

    Article  Google Scholar 

  • Wang, K., Veeramani, D., & Chen, J. (2004). Distributed production planning using a graph-based negotiation protocol. International Journal of Production Research, 42(15), 3077–3099.

    Article  Google Scholar 

  • Zhong, R., Huang, G., Lan, S., Dai, Q., Zhang, T., & Xu, C. (2015). A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing. Advance Engineering Informatics, 29(4), 799–812.

    Article  Google Scholar 

  • Zhong, R., Li, Z., Pang, L., Pan, Y., Qu, T., & Huang, G. (2013). RFID-enabled real-time advanced planning and scheduling shell for production decision making. International Journal of Computer Integrated Manufacturing, 26(7), 649–662.

    Article  Google Scholar 

Download references

Acknowledgements

This work is partly supported by National Natural Science Foundation of China (Grants 51475032 and 51705014), and Hong Kong Scholar Program (Project Nos. XJ2016004 and G-YZ0K in The Hong Kong Polytechnic University).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Fei Tao.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Cheng, Y., Bi, L., Tao, F. et al. Hypernetwork-based manufacturing service scheduling for distributed and collaborative manufacturing operations towards smart manufacturing. J Intell Manuf 31, 1707–1720 (2020). https://doi.org/10.1007/s10845-018-1417-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10845-018-1417-8

Keywords

Navigation