We consider the problem of scheduling two jobs A and B on a set of m uniform parallel machines. Each job is assumed to be independent from the other: job A and job B are made up of n A and n B operations, respectively. Each operation is defined by its processing time and possibly additional data such as a due date, a weight, etc., and must be processed on a single machine. All machines are uniform, i.e. each machine has its own processing speed. Notice that we consider the special case of equal-size operations, i.e. all operations have the same processing time. The scheduling of operations of job A must be achieved to minimize a general cost function F A, whereas it is the makespan that must be minimized when scheduling the operations of job B. These kind of problems are called multiple agent scheduling problems. As we are dealing with two conflicting criteria, we focus on the calculation of strict Pareto optima for F A and \(C_{\mathrm{max}}^{B}\) criteria. In this paper we consider different min-max and min-sum versions of function F A and provide special properties as well as polynomial time algorithms.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • Agnetis, A., Mirchandani, P., Pacciarelli, D., & Pacifici, A. (2000). Nondominated schedules for a job-shop with two competing users. Computational & Mathematical Organization Theory, 6(2), 191–217.

    Article  Google Scholar 

  • Agnetis, A., Mirchandani, P., Pacciarelli, D., & Pacifici, A. (2004). Scheduling problems with two competing agents. Operations Research, 42(2), 229–242.

    Article  Google Scholar 

  • Baker, K., & Smith, J. (2003). A multiple-criterion model for machine scheduling. Journal of Scheduling, 6, 7–16.

    Article  Google Scholar 

  • Balasubramanian, H., Fowler, J., Keha, A., & Pfund, M. (2009). Scheduling interfering job sets on parallel machines. European Journal of Operational Research, 199(1), 55–67. doi:10.1016/j.ejor.2008.10.038.

    Article  Google Scholar 

  • Baptiste, P. (1999). Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing times. Journal of Scheduling, 2, 245–252.

    Article  Google Scholar 

  • Baptiste, P. (2000). Scheduling equal-length jobs on identical parallel machines. Discrete Applied Mathematics, 103(1–3), 21–32. doi:10.1016/S0166-218X(99)00238-3.

    Article  Google Scholar 

  • Baptiste, P. (2003). A note on scheduling multiprocessor tasks with identical processing times. Computers and Operations Research, 30(13), 2071–2078.

    Article  Google Scholar 

  • Baptiste, P., & Brucker, P. (2004). Scheduling equal processing time jobs. In J. Y. Leung (Ed.), Handbook of scheduling: algorithms, models and performance analysis. London/ Boca Raton: Chapman & Hall / CRC Press.

    Google Scholar 

  • Baptiste, P., Chrobak, M., Dürr, C., & Sourd, F. (2004). Preemptive multi-machine scheduling of equal-length jobs to minimize the average flow time. arXiv:cs/0412094.

  • Brucker, P., & Kravchenko, S. (2008). Scheduling jobs with equal processing times and time windows on identical parallel machines. Journal of Scheduling, 11, 229–237.

    Article  Google Scholar 

  • Cheng, T., Ng, C., & Yuan, J. (2006). Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs. Theoretical Computer Science, 362, 273–281.

    Article  Google Scholar 

  • Chrobak, M., Durr, C., Jawor, W., Kowalik, L., & Kurowski, M. (2006). A note on scheduling equal-length jobs to maximize throughput. Journal of Scheduling, 9, 71–73.

    Article  Google Scholar 

  • Dessouky, M. I., Lageweg, B. J., Lenstra, J. K., & van de Velde, S. L. (1990). Scheduling identical jobs on uniform parallel machines. Statistica Neerlandica, 44(3), 115–123.

    Article  Google Scholar 

  • Ehrgott, M. (2005). Multicriteria optimization (2nd ed.). Berlin: Springer.

    Google Scholar 

  • Graham, R. L., EL, Lawler, Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 287–326.

    Article  Google Scholar 

  • Huynh Tuong, N., & Soukhal, A. (2009). Interfering job set scheduling on two-operation three-machine flowshop. In IEEE—RIVF international conference on computing and communication technologies (RIVF’09), Da Nang, Vietnam.

    Google Scholar 

  • Huynh Tuong, N., Soukhal, A., & Billaut, J. C. (2009). New scheduling problems with interfering and independent jobs, 33 p. Paper submitted to Journal of Scheduling the 8 September 2009.

  • Lawler, E. L. (1973). Optimal sequencing of a single machine subject to precedence constraints. Management Science, 19(5), 544–546. doi:10.1287/mnsc.19.5.544.

    Article  Google Scholar 

  • Leung, J. Y. T., Pinedo, M., & Wan, G. (2010). Competitive Two-Agent Scheduling and Its Applications. Operations Research, 58(2), 458–469. doi:10.1287/opre.1090.0744.

    Article  Google Scholar 

  • Ng, C., Cheng, T., & Yuan, J. (2006). A note on the complexity of the problem of two-agent scheduling on a single machine. Journal of Combinatorial Optimization, 12(4), 387–394. doi:10.1007/s10878-006-9001-0.

    Article  Google Scholar 

  • T’kindt, V., & Billaut, J. C. (2006). Multicriteria scheduling: theory, models and algorithms (2nd ed.). Berlin: Springer.

    Google Scholar 

  • Tuzikov, A., Makhaniok, M., & Männer, R. (1998). Bicriterion scheduling of identical processing time jobs by uniform processors. Computers and Operations Research, 25(1), 31–35.

    Article  Google Scholar 

  • Yuan, J., Shang, W., & Feng, Q. (2005). A note on the scheduling with two families of jobs. Journal of Scheduling, 8, 537–542.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Donatas Elvikis.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Elvikis, D., Hamacher, H.W. & T’kindt, V. Scheduling two agents on uniform parallel machines with makespan and cost functions. J Sched 14, 471–481 (2011). https://doi.org/10.1007/s10951-010-0201-1

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10951-010-0201-1

Keywords

Navigation