Abstract
Conventional reliability analysis relies on the probability theory and the binary states i.e. success or failed state of a component or system only. This type of reliability analysis amplifies the uncertainty in computation of system reliability. To overcome this problem, the concept of fuzzy reliability has been used in the evaluation of reliability of the system and the binary states i.e. success and failure of a component or system is viewed in a fuzzy way. Mathematical formulation of the fault-tolerant skim milk powder system is carried out using mnemonic rule and the governing Chapman–Kolmogorov differential equations are solved with fourth order Runge–Kutta method. In this paper, the effect of failure rate, repair rate of each subsystem and coverage factor on fuzzy availability of skim milk powder system is analyzed.
Similar content being viewed by others
References
Akhtar S (1994) Reliability of K-out-of-N: G system with imperfect fault coverage. IEEE Trans Reliab 43:101–106
Ameri S, Dugan J, Misra R (1999) Optimal reliability of systems subject to imperfect fault-coverage. IEEE Trans Reliab 48:275–284
Ameri S, McLaughlin L, Yadlapati B (2003) Optimal cost-effective design of parallel systems subject to imperfect fault-coverage. In: Proc reliability & maintainability symp, pp 29–34
Ameri S, Pham H, Dill G (2004) Optimal design of K-out-of-N: G subsystems subjected to imperfect fault-coverage. IEEE Trans Reliab 53:567–575
Amiri M, Tari FG (2007) A methodology for analyzing the transient availability and survivability of a system with repairable component. Appl Math Comput 184:300–307
Antonsson EK, Sebastian HJ (2005) Fuzzy fitness functions applied to engineering design problems. Eur J Oper Res 166:794–811
Arnold T (1973) The concept of coverage and its effect on the reliability model of a repairable system. IEEE Trans Comput 20(11):1306–1311
Arora N, Kumar D (1997) Availability analysis of steam and power generation systems in thermal power plant. Microelectron Reliab 37:795–799
Balaguruswamy E (1984) Reliability engineering. Tata McGraw Hill, New Delhi
Barlow RE, Proschan F (1965) Mathematical theory of reliability. Wiley, New York
Cai KY, Wen CY, Zhang ML (1991a) Fuzzy reliability modelling of gracefully degradable computing systems. Reliab Eng Syst Saf 33:141–157
Cai KY, Wen CY, Zhang ML (1991b) Fuzzy variables as a basis for a theory of fuzzy reliability in the possibility context. Fuzzy Sets Syst 42:45–172
Cai KY, Wen CY, Zhang ML (1991c) Profust reliability behaviour of typical systems with two types of failures. Fuzzy Sets Syst 43(1):17–32
Cai KY, Wen CY, Zhang ML (1993) Fuzzy states as a basis for a theory of fuzzy reliability. Microelectron Reliab 33(1):2253–2263
Daneshkhah A, Bedford T (2013) Probabilistic sensitivity analysis of system availability using Gaussian process. Reliab Eng Syst Saf 112:82–92
Dhillion BS, Singh C (1991) Engineering reliability: new techniques and applications. Wiley, New York
Garg H, Sharma SP (2011) Behavioral analysis of urea decomposition system in a fertilizer plant. Int J Ind Syst Eng 8(3):271–297
Garg H, Sharma SP (2012) Behavior analysis of synthesis unit in fertilizer plant. Int J Qual Reliab Manag 29(2):217–232
Garg S, Singh J, Singh DV (2010) Availability analysis of crank-case manufacturing in a two-wheeler automobile industry. Appl Math Model 34:1672–1683
Gupta P, Lal AK, Sharma RK, Singh J (2005a) Behavioral study of the cement manufacturing plant—a numerical approach. J Math Syst Sci 1:50–70
Gupta P, Lal AK, Sharam RK, Singh J (2005b) Numerical analysis of reliability and availability of the serial processes in butter-oil processing plant. Int J Qual Reliab Manag 22(3):303–316
Gupta P, Lal AK, Sharma RK, Singh J (2007) Analysis of reliability and availability of serial process of plastic-pipe manufacturing plant. Int J Qual Reliab Manag 24(4):404–419
Gupta S, Tewari PC, Sharma AK (2008) Performance modeling and decision support system of feed water unit of a thermal power plant. S Afr J Ind Eng 19(2):125–134
Gupta S, Tewari PC, Sharma AK (2009) Reliability and availability analysis of the ash handling unit of a steam thermal power plant. S Afr J Ind Eng 20(1):147–158
Huang HI, Lin CH, Ke JC (2006) Parametric nonlinear programming approach for a repairable system with switching failure and fuzzy parameters. Appl Math Comput 183:508–517
Jain M (1998) Reliability analysis of two unit system with common cause shock failures. Int J Pure Appl Math 29(12):1–8
Jain M, Agrarwal SC, Preeti Ch (2012) Fuzzy reliability evaluation of a repairable system with imperfect coverage, reboot and common-cause shock failure. Int J Eng 25(3):231–238
Jiang Q, Chen CH (2003) A numerical algorithm of fuzzy reliability. Reliab Eng Syst Saf 86(3):299–307
Ke JC, Huang H, Lin CH (2008) Redundant repairable system with imperfect coverage and fuzzy parameters. Appl Math Model 32:2839–2850
Khanduja R, Tewari PC, Kumar D (2008) Availability analysis of bleaching system of a paper plant. J Ind Eng Udyog Pragati NITIE Mumbai 32(1):24–29
Khanduja R, Tewari PC, Kumar D (2012) Steady state behavior and maintenance planning of bleaching system in a paper plant. Int J Ind Eng 7(12):39–44
Klir GJ, Yuan B (2005) Fuzzy set and fuzzy logic theory and applications. Prentice-Hall of India, New-Delhi
Komal, Sharma SP, Kumar D (2010) RAM analysis of repairable industrial systems utilizing uncertain data. Appl Soft Comput 10:1208–1221
Krishan R, Somasundaram S (2011) Reliability analysis of repairable consecutive-K-out-of-N: G systems with sensor and repairmen. Int J Qual Reliab Manag 28(8):894–908
Kumar K, Kumar P (2011) Fuzzy availability modeling and analysis of biscuit manufacturing plant: a case study. Int J Syst Assur Engg Manag 2(3):193–204
Kumar S, Tewari PC (2011) Mathematical modeling and performance optimization of CO2 cooling system of a fertilizer plant. Int J Ind Eng Comput 2:689–698
Kumar D, Sadhu PK, Chakrabarti R (2005) Fuzzy markov model for determination of fuzzy state probabilities of generating units including the effect of maintenance scheduling. IEEE Trans Power Syst 20:2117–2124
Kumar K, Singh J, Kumar P (2009) Fuzzy reliability and fuzzy availability of the serial processes in butter-oil processing plant. J Math Stat 3(1):65–71
Levitin G, Amari S (2008) Multi-state systems with multi-fault coverage. Reliab Eng Syst Saf 93:1730–1739
Li Yuan, Meng XY (2011) Reliability analysis of a warm standby repairable system with priority in use. Appl Math Model 35:4295–4303
Li CY, Chen X, Yi XS, Tao JY (2010) Heterogeneous redundancy optimization for multi-state series–parallel systems subject to common cause failures. Reliab Eng Syst Saf 95(3):202–207
Liang GS, Wang MJJ (1993) Fuzzy fault tree analysis using failure possibilities. Microelectron Reliab 33:583–597
Mehmood R, Lu JA (2011) Computational markovian analysis of large systems. J Manuf Technol Manag 22(6):804–817
Moustafa M (1997) Reliability analysis of K-out-of-N: G systems with dependent failures and imperfect coverage. Reliab Eng Syst Saf 58:15–17
Myers A, Rauzy A (2008) Assessment of redundant systems with imperfect coverage by means of binary decision diagrams. Reliab Eng Syst Saf 93(7):1025–1035
Pham H (1992) Reliability analysis of a high voltage system with dependent failures and imperfect coverage. Reliab Eng Syst Saf 37:25–28
Prabhudeva S, Verma AK (2007) Coverage modeling and reliability analysis using multi-state function. Int J Autom Comput 4(4):380–387
Ram M, Singh SB, Varshney RG (2013) Performance improvement of a parallel redundant system with coverage factor. J Eng Sci Technol 8(3):344–350
Rausard M, Hoyland A (2004) System reliability theory: models, statistical methods and applications, 2nd edn. Wiley-Inderscience Publisher, Hoboken
Razak AK, Rajkumar K (2013) A study on reliability measures. Appl Math Sci 7(67):3335–3343
Salamah MJA, Shayan E, Savsar M (2006) Reliability analysis of a cooling seawater pumping station. Int J Qual Reliab Manag 23(6):670–695
Sandler GH (1993) System reliability engineering. Printice-Hall, Englewood Cliffs
Shakuntla Kajal S, Lal AK, Bhatia SS, Singh J (2011) Availability analysis of poly tube industry when two sub-system are simultaneous fail. Bangladesh J Sci Ind Res 46(4):475–480
Sharma MK, Pandey D (2009) Fuzzy reliability and fuzzy availability of a three unit degraded systems. Int J Math Sci Eng Appl 3(2):199–213
Sharma A, Singh J, Kumar K (2010a) Availability evaluation of an agricultural machine (a numerical approach). Math Sci 3:295–310
Sharma A, Singh Jai, Kumar K (2010b) Availability evaluation of the serial processes in a paper production industry. Math Sci 4(4):445–465
Shooman ML (1968) Probabilistic reliability: an engineering approach. McGraw-Hill, New York
Singer D (1990) A fuzzy set approach to fault tree and reliability analysis. Fuzzy Sets Syst 34:145–155
Singh CJ, Jain M (2000) Reliability of repairable multi component redundant system. Int J Eng 13(4):17–22
Singh J, Mahajan P (1999) Reliability of utensils manufacturing plant—a case study. Oper Res 36(3):260–269
Srinath LS (1994) Reliability Engineering, 3rd edn. East-West Press, New Delhi
Veeramany A, Pandey MD (2011a) Reliability analysis of nuclear component cooling water system using semi-Markov model. Nucl Eng Des 241:1790–1806
Veeramany A, Pandey MD (2011b) Reliability analysis of nuclear piping system using semi-Markov process model. Ann Nucl Energy 38:1133–1139
Verma AK, Srividya A, Prabhu Gaonkar R (2003) Two approaches to model fuzzy availability of a deteriorating system. In: Proc 2nd International Conference on Quality, Reliability and Information Technology, pp 330–336
Verma AK, Srividya A, Prabhu Gaonkar R (2004) Fuzzy availability modeling of a semi-Markovian deteriorating system. In: Proc 15th IASTED International Conference on Modeling and Simulation, pp 46–49
Verma AK, Srividya A, Prabhu Gaonkar R (2008) Computing availability using hybrid approach and single value fuzzy simulation. Int J Model Simul 28(1):72–79
Wu HC (1997) Fuzzy reliability analysis based on closed fuzzy numbers. Inf Sci 103:35–159
Yusuf I, Bala SI (2012) Stochastic modeling of a two unit parallel system under two types of failures. Int J Latest Trends Math 2(1):44–53
Zadeh LA (1965) Fuzzy sets. Inf Control 8:338–353
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Aggarwal, A.K., Kumar, S. & Singh, V. Mathematical modeling and fuzzy availability analysis of skim milk powder system of a dairy plant. Int J Syst Assur Eng Manag 7 (Suppl 1), 322–334 (2016). https://doi.org/10.1007/s13198-014-0252-3
Received:
Revised:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s13198-014-0252-3