Skip to main content

Advertisement

Log in

Evaluation of hydropower project implementing coordination degree on the perspective of stakeholders

  • Original article
  • Published:
International Journal of System Assurance Engineering and Management Aims and scope Submit manuscript

Abstract

The construction of large and medium-sized hydropower projects involves multiple stakeholders. The way various parties interact affects the construction and management of a project. As the construction of hydropower projects has progressed, the governance of the coordination relationship among stakeholders has become a more pressing and troublesome issue in project management research. We propose an Entropy-TOPSIS measurement method for hydropower project coordination stakeholders, and we use it to assess the degree of coordination among various stakeholders in the Sichuan JL. The results show that the owner, the supervision unit, and the subcontractor have good overall coordination, with a coordinated development degree of over 0.519. With an average coordinated development degree of over 0.361, the design unit and the supplier are next. The overall coordination of the general contractor is the worst, with a coordinated development degree of only 0.201. As a result, in this case, it is necessary to improve the general contractor's project management capabilities so that they can manage other stakeholders in a targeted and coordinated manner.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Fig.1
Fig. 2
Fig. 3

Similar content being viewed by others

Data availability

All data, models, and code generated or used during the study appear in the submitted article.

References

Download references

Acknowledgements

This research was funded Research Center for Reservoir Resettlement, China Three Gorges University (Grant No.2019KQ03), and funded by National Science Foundation of China Youth Science Foundation Project (Project No. 72004116), and Science Foundation of Youth Science Foundation Project, China Three Gorges University (Grant No. KJ2019A001). The authors appreciate the editors and anonymous reviewers for their valuable suggestions.

Funding

We change one funding information from Research Center for Reservior Resettlement. China three Gorges University (Grant No. 2020KF10) to Research Center for Reservior Resettlement. China three Gorges University (Grant No. 2019KQ03). This is because of our mistake. We are so sorry for the careless.

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Min An or Ye Tian.

Ethics declarations

Conflict of interests

China Communications Construction Company Second Highway Consultants CO.LTD had no competing interest in this paper. The authors have declared that no competing interests exist.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Huang, J., Huang, A., An, M. et al. Evaluation of hydropower project implementing coordination degree on the perspective of stakeholders. Int J Syst Assur Eng Manag 13, 1187–1197 (2022). https://doi.org/10.1007/s13198-021-01413-3

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13198-021-01413-3

Keywords

Navigation