Innovative Applications of O.R.
Minimizing shifts for personnel task scheduling problems: A three-phase algorithm

https://doi.org/10.1016/j.ejor.2014.01.035Get rights and content

Highlights

  • We propose a state-of-the-art algorithm for the personnel scheduling problem.

  • Sorting tasks in the ascending order of their start times yields good initial solutions.

  • The Boltzmann function enables solutions to overcome their local minima.

  • The advantage of the algorithm is significant, especially for large-scale problems.

Abstract

The personnel task scheduling problem is a subject of commercial interest which has been investigated since the 1950s. This paper proposes an effective and efficient three-phase algorithm for solving the shift minimization personnel task scheduling problem (SMPTSP). To illustrate the increased efficacy of the proposed algorithm over an existing algorithm, computational experiments are performed on a test problem set with characteristics motivated by employee scheduling applications. Experimental results show that the proposed algorithm outperforms the existing algorithm in terms of providing optimal solutions, improving upon most of the best-known solutions and revealing high-quality feasible solutions for those unsolved test instances in the literature.

Introduction

Since the pioneering studies of Edie (1954) and Dantzig (1954), the personnel scheduling problem (PSP) has continued to be a topic of interest to researchers and practitioners. The PSP consists of the various decisions which must be made, such as the assignment of tasks and/or shift sequences. On the basis of the planning horizon, current PSPs can be divided into three typical classifications (Baker, 1976): shift scheduling, days off scheduling and tour scheduling. In the shift scheduling problem, a roster across a time-of-day planning horizon is specified to meet the staff requirements regarding each shift; in the days off scheduling problem, a roster is set under the constraint that the length of the operating week in the facility does not match the length of an employee’s working week; and in the tour scheduling problem, which combines the first two types, both the hours of the day and the days of the week in which each employee must work are determined (Van den Bergh, Beliën, De Bruecker, Demeulemeester, & De Boeck, 2013). The three types of PSPs are common in many application areas, such as service systems, manufacturing systems, transportation systems, call centers, airlines, hotels, hospitals and health care systems.

The ongoing interest of researchers has been motivated by the opportunities for the widespread applications of PSPs. The literature on the PSP exhibits a wide range of research methodologies which can be classified either as exact methods or as those based on heuristic algorithms. Exact methods, which have appeared in PSP research, include: linear programming (Fowler et al., 2008, Hochbaum and Levin, 2006, Hojati and Patil, 2011); constraint programming (Laporte and Pesant, 2004, Qu and He, 2009); goal programming (Azaiez and Al Sharif, 2005, Lin et al., 2012, Topaloglu and Ozkarahan, 2004), integer programming (Eiselt and Marianov, 2008, Eitzen et al., 2004, Seckiner et al., 2007); mixed integer programming (Firat and Hurkens, 2012, Hertz et al., 2010, Yilmaz, 2012); column generation (Al-Yakoob and Sherali, 2008, He and Qu, 2012, Restrepo et al., 2012); dynamic programming (Beliën and Demeulemeester, 2007, Elshafei and Alfares, 2008); and Lagrange relaxation (Bard and Purnomo, 2007, Pot et al., 2008). Although hundreds of exact methods have been proposed in the literature, the computational requirements for obtaining optimal solutions by exact methods are high, even for a moderate-sized PSP. For large-scale PSPs, exact methods may not quickly produce any feasible solutions.

The inherent difficulties of PSPs have encouraged the development of heuristic algorithms for large-scale problems, as required in typical real-world systems, in order to obtain the best solutions within a reasonable computing time (Ernst, Jiang, Krishnamoorthy, & Sier, 2004). The heuristic algorithms in the literature are of two types: constructive heuristics and improvement heuristics. The constructive heuristic is essentially a single pass method which uses a specific rule to assign a priority index to each employee and, in each step, to specify a shift or task. Once an employee’s shift is determined, it is fixed and cannot be reversed (Ying & Liao, 2003). During the last decade, constructive heuristic algorithms have been proposed for a variety of applications with respect to PSPs, such as nurse scheduling problems (Brucker et al., 2010, Wright et al., 2006), crew scheduling problems (Elizondo et al., 2010, Lin et al., 2012) and truck driver scheduling problems (Goel, Archetti, & Savelsbergh, 2012). The major advantage of these constructive heuristics is that they can yield rosters rapidly. However, the quality of the obtained rosters is often not as good as expected, especially for large-scale problems.

In contrast, the improvement heuristic method begins with an initial roster and then a scheme is implemented for iteratively generating an improved roster (Ying & Liao, 2004). In improvement heuristics, meta-heuristics form an important methodology for the solving of complex PSPs. In the literature, Tabu search (Di Gaspero et al., 2007, Elizondo et al., 2010, Lucic and Teodorovic, 2007), genetic algorithms (Asensio-Cuesta et al., 2012, Beddoe and Petrovic, 2006, Moz and Pato, 2007) and simulated annealing (Akbari et al., 2013, Cordeau et al., 2010, Thompson and Goodale, 2006) are the three meta-heuristics most used in the solving of PSPs. In addition to these three general classes, other popular meta-heuristics have been developed for dealing with PSPs, including the scatter search (Burke et al., 2010, Laguna et al., 2005, Maenhout and Vanhoucke, 2010), iterated local search (Bellanti et al., 2004, Burke et al., 2011), variable neighborhood search (Burke et al., 2008, Burke et al., 2010), particle swarm optimization (Akjiratikarl et al., 2007, Gunther and Nissen, 2010, Nissen and Gunther, 2009), memetic algorithm (Ozcan, 2005), electromagnetic meta-heuristic (Maenhout & Vanhoucke, 2007), neural network (Hao, Lai, & Tan, 2004), ant colony optimization (Gutjahr & Rauner, 2007), greedy random adaptive search procedure (Goodman, Dowsland, & Thompson, 2009), hill-climbing heuristic (Cipriano, Di Gaspero, & Dovier, 2006) and the hyper-heuristic algorithm (Chakhlevitch & Cowling, 2005). The major advantage of these meta-heuristics lies in their effectiveness, i.e., their ability to obtain workable rosters within a limited computing time. However, these meta-heuristics cannot demonstrably produce optimal solutions, nor can they demonstrably reduce the search space (Burke, Li, et al., 2010). For further detailed discussion of the available algorithms proposed by the research community with respect to PSPs, the reader is referred to the review articles of Alfares, 2004, Burke et al., 2004, Kohl and Karisch, 2004, Ernst et al., 2004, Ernst et al., 2004 and Van den Bergh et al. (2013).

Motivated by the need for practical day-to-day rostering in large service operations, this work has investigated a variant of the PSP, named the shift minimization personnel task scheduling problem (SMPTSP). The characteristics of the SMPTSP are: (1) that the only cost incurred is that owing to the number of workers (shifts) that are required to perform the given set of tasks; (2) that each worker possesses the set of qualifications or skills required in the performance of a subset of, but not all, tasks; (3) that each task is performed by exactly one qualified worker, as indicated by a shift with specified start and end times; and (4) that the objective is to minimize the total number of shifts/workers used. This variant of the PSP is important both as a planning tool, in order to minimize the number of staff members that an organization is required to maintain, and as a day-to-day operational management tool, in order to determine the number of staff members needed to perform all tasks on a particular day.

The SMPTSP introduced by Krishnamoorthy, Ernst, and Baatar (2012) was originally derived from a staff rostering problem (Dowling, Krishnamoorthy, Mackenzie, & Sier, 1997) at a large international airport, involving about 500 staff members and a monthly planning horizon. In that study, the authors described a mathematical formulation and proposed a new heuristic based on the volume algorithm (VA) and Wedelin’s algorithm (WA), named VAWA, for solving the SMPTSP. Both the VA and WA allow for some of the harder constraints to be relaxed and, thus, the remaining problem to be easily solved. Therefore, the VAWA is computationally efficient and can be used to solve large-scale problems, such as those found in real-world applications.

In the literature, solution algorithms, with respect to PSPs, are heavily skewed towards exact methods and meta-heuristics. Recently, multi-phase approaches and hybrid techniques, which deal with heavily constrained PSPs, have received increased attention from researchers. Therefore, in this study, an effective and efficient three-phase algorithm has been proposed, which combines the respective advantages of a constructive heuristic, a meta-heuristic and an exact method, for solving the SMPTSP. The remainder of this paper is organized as follows: the SMPTSP is defined in Section 2; in Section 3, the proposed three-phase algorithm is described in detail; in Section 4, the effectiveness and efficiency of the proposed algorithm is evaluated using a test problem set and its performance is compared to an existing algorithm, VAWA, drawn from the literature; and finally, in Section 5, this study concludes with recommendations for future studies.

Section snippets

Problem definition

The shift minimization personnel task scheduling problem (SMPTSP) can be defined formally as follows. A set of tasks T = {t1,  , tn} needs to be allocated to a set of heterogeneous workers W = {w1,  , wm} over a specified planning horizon. The processing time interval at which a task has to be performed is determined by a timetable with fixed start and end times. Each worker possesses a number of specific skills or qualifications which enable them to perform a subset of the tasks, but not all of them.

Development of the proposed algorithm

The proposed approach consists of three phases. In the first phase, a constructive heuristic is used to quickly obtain an initial solution to the SMPTSP. In the second phase, an iterated greedy (IG) heuristic is applied to improve upon the initial solution and obtain a near-optimal schedule. Finally, the near-optimal schedule is set as an initial solution; it represents an upper bound on the objective function for the BIP formulation if it is feasible, and further solves the BIP formulation by

Computational results

In this section, the computational experiments used to evaluate the performance of the proposed approach are described. The details of the test problems, execution environment, parameter selection and the computational results of the proposed approach as compared to the existing algorithm, VAWA (Volume Algorithm + Wedelin’s Algorithm) (Krishnamoorthy et al., 2012), and the Lower Bound (LB) of the optimal solutions are discussed.

Conclusions and recommendations for future studies

This study proposed an easy-to-comprehend three-phase algorithm for solving the SMPTSP. The experimental results underlined the superiority of the proposed algorithm over the existing algorithm. New best-known and optimal solutions were found in most cases of the test instances, while quality feasible solutions for unsolved test instances in the literature were discovered. The differences in the computational results between the proposed algorithm and comparable algorithms were statistically

Acknowledgements

The authors would like to thank Professors Krishnamoorthy, Ernst, and Baatar for providing their test problem set and solutions to us. The work of the first author is grateful to the National Science Council of the Republic of China (Taiwan) and the Chang Gung Memory Hospital for financially supporting this research Grants NSC101-2410-H-182-004-MY2 and CARPD3B0011, respectively. The second author is grateful to the National Science Council of the Republic of China (Taiwan) for financially

References (78)

  • A. Goel et al.

    Truck driver scheduling in Australia

    Computers and Operations Research

    (2012)
  • W.J. Gutjahr et al.

    An ACO algorithm for a dynamic regional nurse scheduling problem in Austria

    Computers and Operations Research

    (2007)
  • F. He et al.

    A constraint programming based column generation approach to nurse rostering problems

    Computers and Operations Research

    (2012)
  • A. Hertz et al.

    A flexible MILP model for multiple-shift workforce planning under annualized hours

    European Journal of Operational Research

    (2010)
  • D.S. Hochbaum et al.

    Cyclical scheduling and multi-shift scheduling: Complexity and approximation algorithms

    Discrete Optimization

    (2006)
  • M. Hojati et al.

    An integer linear programming-based heuristic for scheduling heterogeneous, part-time service employees

    European Journal of Operational Research

    (2011)
  • M. Krishnamoorthy et al.

    Algorithms for large scale shift minimisation personnel task scheduling problems

    European Journal of Operational Research

    (2012)
  • H.T. Lin et al.

    Crew rostering with multiple goals: An empirical study

    Computers and Industrial Engineering

    (2012)
  • S.W. Lin et al.

    Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates

    Computers and Operations Research

    (2011)
  • B. Maenhout et al.

    A hybrid scatter search heuristic for personalized crew rostering in the airline industry

    European Journal of Operational Research

    (2010)
  • M. Moz et al.

    A genetic algorithm approach to a nurse rerostering problem

    Computers and Operations Research

    (2007)
  • M.I. Restrepo et al.

    Constrained network-based column generation for the multi-activity shift scheduling problem

    International Journal of Production Economics

    (2012)
  • R. Ruiz et al.

    A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem

    European Journal of Operational Research

    (2007)
  • R. Ruiz et al.

    An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives

    European Journal of Operational Research

    (2008)
  • G. Schrimpf et al.

    Record breaking optimization results using the ruin and recreate principle

    Journal of Computational Physics

    (2000)
  • G.M. Thompson et al.

    Variable employee productivity in workforce scheduling

    European Journal of Operational Research

    (2006)
  • J. Van den Bergh et al.

    Personnel scheduling: A literature review

    European Journal of Operational Research

    (2013)
  • K.C. Ying et al.

    Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic

    Expert Systems with Applications

    (2010)
  • K.C. Ying et al.

    An ant colony system for permutation flow-shop sequencing

    Computers and Operations Research

    (2004)
  • K.C. Ying et al.

    Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic

    Expert Systems with Applications

    (2009)
  • M. Akbari et al.

    Scheduling part-time and mixed-skilled workers to maximize employee satisfaction

    International Journal of Advanced Manufacturing Technology

    (2013)
  • H.K. Alfares

    Survey, categorization, and comparison of recent tour scheduling literature

    Annals of Operations Research

    (2004)
  • S.M. Al-Yakoob et al.

    A column generation approach for an employee scheduling problem with multiple shifts and work locations

    Journal of the Operational Research Society

    (2008)
  • S. Asensio-Cuesta et al.

    A genetic algorithm for the design of job rotation schedules considering ergonomic and competence criteria

    International Journal of Advanced Manufacturing Technology

    (2012)
  • K.R. Baker

    Workforce allocation in cyclical scheduling problems: A survey

    Operational Research Quarterly

    (1976)
  • J.F. Bard et al.

    Cyclic preference scheduling of nurses using a Lagrangian-based heuristic

    Journal of Scheduling

    (2007)
  • J. Beliën et al.

    On the trade-off between staff-decomposed and activity-decomposed column generation for a staff scheduling problem

    Annals of Operations Research

    (2007)
  • P. Brucker et al.

    A shift sequence based approach for nurse scheduling and a new benchmark dataset

    Journal of Heuristics

    (2010)
  • E.K. Burke et al.

    A scatter search methodology for the nurse rostering problem

    Journal of the Operational Research Society

    (2010)
  • Cited by (0)