Skip to main content
Log in

A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints

  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

Abstract

This paper introduces a new matrix-based formulation for assembly trees which facilitates solving the manufacturing resource planning (MRP) problem including resource constraints for a large class of problems. The algorithm seamlessly integrates assembly tree information, capacity requirements, and traditional manufacturing resource planning; the algorithm allows for a large class of capacity limitations, and solves these problems without requiring a manager to iteratively adjust the MRP schedule.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Baker, K. (1974) Introduction to Sequencing and Scheduling, John Wiley and Sons.

  • Bedworth, D. and Bailey, J. (1998) Integrated Production Control Systems, John Wiley & Sons, New York, NY.

    Google Scholar 

  • Harris, B., Lewis, F. and Cook, D. (1998) Machine planning for manufacturing: dynamic resource allocation and on-line supervisory control. Journal of Intelligent Manufacturing, 9, 413-430.

    Google Scholar 

  • Hillier, F. and Lieberman, G. (1995) Introduction to Operations Research, McGraw Hill.

  • Lewis, F., Huang, H., Fierro, R. and Tacconi, D. (1995) Real-time task planning, resource allocation, and deadlock avoidance, Proceedings of Workshop on Architectures for Semiotic Modeling, August.

  • Panwalker, S. and Iskander, W. (1977) A Survey of scheduling rules. Operations Research, 26(1), 46-61.

    Google Scholar 

  • Saridis, G. and Wyes, J. On the theory of intelligent machines. Proceedings of the NATO Advanced Study Institute: Expert Systems and Robotics, 71, 551-579.

  • Tacconi, D. and Lewis, F. (1997) A new matrix model for discrete event systems: application to simulation. IEEE Control Systems Magazine, October.

  • Tate, A. (1977) Generating project networks. International Joint Conference on Artificial Intelligence, pp. 888-893.

  • Vollmann, T., Berry, W. and Whybark, D. (1997) Manufacturing Planning and Control Systems. McGraw-Hill.

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Harris, B., Lewis, F. & Cook, D.J. A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints. Journal of Intelligent Manufacturing 13, 239–252 (2002). https://doi.org/10.1023/A:1016060009229

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/A:1016060009229

Navigation