Abstract
This paper presents a Markov process model and an approximate decomposition technique for a discrete material transfer line with limited buffer capacity. A fraction of the parts processed at some stations in the line may be scrapped or reworked at dedicated machines to meet product quality requirements. Reworked parts are not sent back into the main line. This leads to splits in the flow of material. Processing times are deterministic and identical for all machines and are taken as the time unit. Machine specific times to failure and to repair are geometrically distributed. The model is analyzed through a decomposition into two‐machine systems. We develop new decomposition equations for machines performing split operations. Production rates and inventory levels are computed and compared to simulation results. The results indicate that the method produces useful results for a variety of systems.
Similar content being viewed by others
References
T. Altiok, Performance Analysis of Manufacturing Systems (Springer, New York, 1996).
G. Artamonov, Productivity of a two-instrument discrete processing line in the presence of failures, Cybernetics 12 (1977) 464–468.
M. B¨urger, Konfigurationsplanung flexibler Fließproduktionssysteme (Galda+Wilch, Glienicke/ Berlin, 1997).
M.H. Burman, New results in flow line analysis, Ph.D. thesis, Massachusetts Institute of Technology (1995). Also available as Report LMP–95–007, MIT Laboratory for Manufacturing and Productivity.
G. Buxey, N. Slack and R. Wild, Production flow line system design-A review, AIIE Transactions 5 (1973) 37–48.
J.A. Buzacott, Automatic transfer lines with buffer stocks, International Journal of Production Research 5(3) (1967) 183–200.
J. Buzacott, The effect of station breakdowns and random processing times on the capacity of flow lines, AIIE Transactions 4 (1972) 308–312.
J.A. Buzacott and L.E. Hanifin, Models of automatic transfer lines with inventory banks-A review and comparison, AIIE Transactions 10(2) (1978) 197–207.
J.A. Buzacott and J.G. Shanthikumar, Stochastic Models of Manufacturing Systems (Prentice Hall, NJ, USA, 1993).
Y. Choong and S.B. Gershwin, A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times, IIE Transactions 19 (1987) 150–159.
Y. Dallery, R. David and X. Xie, Approximate analysis of transfer lines with unreliable machines and finite buffers, IEEE Transactions on Automatic Control 34(9) (1989) 943–953.
Y. Dallery, R. David and X. Xie, An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers, IIE Transactions 20(3) (1988) 280–283.
Y. Dallery and S.B. Gershwin, Manufacturing flow line systems: A review of models and analytical results, Queueing Systems 12(1–2) (1992) 3–94.
M. Di Mascolo, R. David and Y. Dallery, Modeling and analysis of assembly systems with unreliable machines and finite buffers, IIE Transactions 23(4) (1991) 315–330.
D.P. Gaver, A waiting line with interrupted service, including priorities, Journal of the Royal Statistical Society 24 (1962) 73–90.
S.B. Gershwin, An efficient decomposition algorithm for the approximate evaluation of tandem queues with finite storage space and blocking, Operations Research 35 (1987) 291–305.
S.B. Gershwin, An efficient decomposition algorithm for unreliable tandem queueing systems with finite buffers, in: Queueing Networks with Blocking, eds. H.G. Perros and T. Altiok (North-Holland, Amsterdam, 1989) pp. 127–146.
S.B. Gershwin, Assembly/disassembly systems: An efficient decomposition algorithm for treestructured networks, IIE Transactions 23(4) (1991) 302–314.
S.B. Gershwin, Manufacturing Systems Engineering (Prentice Hall, New Jersey, 1994).
S.B. Gershwin and O. Berman, Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers, AIIE Transactions 13(1) (1981) 2–11.
S. Gershwin and I. Schick, Continuous model of an unreliable two-stage material flow system with a finite interstage buffer, Technical Report LIDS-R-1039, Massachusetts Institute of Technology, Cambridge (1980).
S.B. Gershwin and I.C. Schick, Modeling and analysis of three-stage transfer lines with unreliable machines and finite buffers, Operations Research 31(2) (1983) 354–380.
M.N. Gopalan and S. Kannan, Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework, Journal of the Operational Research Society 45(7) (1994) 797–805.
S. Helber, Exact analysis of the two-machine transfer line with limited buffer capacity and geometrically distributed processing times, times to failure and times to repair, Technical report, Ludwig-Maximilians-Universit¨at M¨unchen, Ludwigstr. 28 RG/V, D-80539 M¨unchen, Germany (1995).
S. Helber, Approximate analysis of unreliable transfer lines with rework or scrapping of parts, Technical report, Working paper OR 320–97, Operations Research Center, Massachusetts Institute of Technology, Cambridge (1997).
S. Helber, Decomposition of unreliable assembly/dissassembly networks with limited buffer capacity and random processing times, European Journal of Operational Research 109(1) (1998) 24–42.
S. Helber, Performance Analysis of Flow Lines with Non-Linear Flow of Material, Lecture Notes in Economics and Mathematical Systems, Vol. 473 (Springer, Berlin, 1999).
F. Hillier and R.W. Boling, Finite queues in series with exponential or Erlang service times-A numerical approach, Operations Research 16 (1967) 286–303.
M.A. Jafari and J.G. Shanthikumar, An approximate model of multistage automatic transfer lines with possible scrapping of workpieces, IIE Transactions 19(3) (1987) 252–265.
E. Koenigsberg, Production lines and internal storage-A review, Management Science 5 (1959) 410–433.
K. Okamura and H. Yamashina, Analysis of the effect of buffer storage capacity in transfer line systems, AIEE Transactions 9 (1977) 127–135.
H.T. Papadopoulus, C. Heavey and J. Browne, Queueing Theory in Manufacturing Systems Analysis and Design (Chapman & Hall, London, 1993).
B. Pourbabai, Optimal utilization of a finite capacity intergrated assembly system, International Journal of Production Research 28(2) (1990) 337–352.
B.L.N. Sastry and P.G. Awate, Analysis of a two-station flow line with machine processing subject to inspection and rework, Opsearch 25 (1988) 89–97.
H. Schmidbauer, —Zur Zuverl¨assigkeit von stochastischen Fertigungssystemen, Habilitationsschrift, Fakult¨at f¨ur Philosophie, Wissenschaftstheorie und Statistik, Ludwig-Maximilians-Universit¨at M¨unchen (1995).
H. Schmidbauer and A. R¨osch, A stochastic model of an unreliable kanban production system, Operations Research Spectrum 16(2) (1994) 155–160.
J.E. Schor, Efficient algorithms for buffer allocation, Master's thesis, Massachusetts Institute of Technology (1995). Also available as MIT Laboratory for Manufacturing and Productivity report LMP–95–006.
B.A. Sevast'yanov, Influence of storage bin capacity on the average standstill time of a production line, Theory of Probability and Its Applications 7 (1962) 429–438.
J.G. Shanthikumar and C.C. Tien, An algorithmic solution to two-stage transfer lines with possible scrapping of units, Management Science 29 (1983) 1069–1086.
J. Wijngaard, The effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates, AIIE Transactions 11(1) (1979) 42–47.
S. Yeralan and E.J. Muth, A general model of a production line with intermediate buffer and station breakdown, IIE Transactions 19(2) (1987) 130–139.
K.-Y.C. Yu and D.L. Bricker, Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework, IIE Transactions 25(1) (1993) 109–112.
B. Zimmern, —Etudes de la propagation des arrêts al´eatoires dans les chaines de production, Review Statistical Applications 4 (1956) 85–104.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Helber, S. Approximate analysis of unreliable transfer lines with splits in the flow of material. Annals of Operations Research 93, 217–243 (2000). https://doi.org/10.1023/A:1018923907048
Issue Date:
DOI: https://doi.org/10.1023/A:1018923907048