Loading [a11y]/accessibility-menu.js
Commissioning-stage poor performance of control loops in process plants | IEEE Conference Publication | IEEE Xplore

Commissioning-stage poor performance of control loops in process plants


Abstract:

Isolating the causes of poor performance observed at the time of commissioning can prove to be difficult especially when oscillations are observed, as these can propagate...Show More

Abstract:

Isolating the causes of poor performance observed at the time of commissioning can prove to be difficult especially when oscillations are observed, as these can propagate and hence mask their source. An approach that combines an analysis of the overall loop performance index, power spectra, physical properties and cross-correlation is proposed to try to distinguish between poor performance caused by tight coupling due to improper system design, or by a loop fault. A case study is presented to clarify the analysis process
Date of Conference: 28-31 August 2005
Date Added to IEEE Xplore: 19 September 2005
Print ISBN:0-7803-9354-6
Print ISSN: 1085-1992
Conference Location: Toronto, ON, Canada

Contact IEEE to Subscribe

References

References is not available for this document.