Loading [a11y]/accessibility-menu.js
Incorrect Operations of Pilot Scheme with Ground Overcurrent Protection | IEEE Conference Publication | IEEE Xplore

Incorrect Operations of Pilot Scheme with Ground Overcurrent Protection


Abstract:

The incorrect operations of the pilot scheme Permissive Overreaching Transfer Trip (POTT) with ground overcurrent element are evaluated in this paper. The practical exper...Show More

Abstract:

The incorrect operations of the pilot scheme Permissive Overreaching Transfer Trip (POTT) with ground overcurrent element are evaluated in this paper. The practical experience of several in practice incorrect operations are gathered to list the associated reasons in setting relay steps. To improve the performance and ensure security of pilot scheme with ground directional overcurrent element, some measures and recommendations are presented regarding the used voltage polarization.
Date of Conference: 05-08 May 2019
Date Added to IEEE Xplore: 11 October 2019
ISBN Information:

ISSN Information:

Conference Location: Edmonton, AB, Canada

Contact IEEE to Subscribe

References

References is not available for this document.