LDCnet: Minimizing the cost of supervision for various types of concept drift | IEEE Conference Publication | IEEE Xplore

LDCnet: Minimizing the cost of supervision for various types of concept drift


Abstract:

Supervision cost is often overlooked when designing decision systems to cope with concept drift. The solution presented in this article utilizes low supervision while ach...Show More

Abstract:

Supervision cost is often overlooked when designing decision systems to cope with concept drift. The solution presented in this article utilizes low supervision while achieving similar efficiency to the state-of-the-art methods. Algorithm bases on a net of classification models which cover the whole feature space, preparing the system for every possible concept. The experiments are performed in the simulated environment with four scenarios representing different types of concept drift.
Date of Conference: 16-19 April 2013
Date Added to IEEE Xplore: 12 September 2013
Electronic ISBN:978-1-4673-5849-1
Conference Location: Singapore

Contact IEEE to Subscribe

References

References is not available for this document.