Loading [a11y]/accessibility-menu.js
A Multi-Crane Scheduling Scheme with Dynamic Priority in Transit Warehouse | IEEE Conference Publication | IEEE Xplore

A Multi-Crane Scheduling Scheme with Dynamic Priority in Transit Warehouse


Abstract:

Aiming at the Multi-Crane Scheduling Problem (MCSP) in the transit warehouse, a scheduling scheme with dynamic priority is proposed in this paper. The problem was modelle...Show More

Abstract:

Aiming at the Multi-Crane Scheduling Problem (MCSP) in the transit warehouse, a scheduling scheme with dynamic priority is proposed in this paper. The problem was modelled with the goal of respectively minimizing the completion time of all tasks and the frequency of crane avoidance. A Simulation-based Genetic Algorithm (SbGA) is designed to solve the model and generate feasible scheduling schemes. Besides, a novel updating strategy for task priority is designed to implement dynamic scheduling. The proposed scheme is applied to an actual industrial case in an iron and steel enterprise. Numerous experiments demonstrate the efficiency of the proposed model and scheme.
Date of Conference: 03-06 July 2023
Date Added to IEEE Xplore: 24 October 2023
ISBN Information:

ISSN Information:

Conference Location: Rome, Italy

Funding Agency:


References

References is not available for this document.