Abstract:
The current paper deals with the cyclic multi-hoist scheduling problem in electroplating lines considering rentrance. Identical parts are produced with processing time wi...Show MoreMetadata
Abstract:
The current paper deals with the cyclic multi-hoist scheduling problem in electroplating lines considering rentrance. Identical parts are produced with processing time windows. Moreover, re-entrance is also considered. These together make it more challenged to obtain better schedules improving the productivity. To achieve this, multi-degree cycles are considered. To our best knowledge, this is the first research in this generally complicated scenario. In order to maximize the productivity of the production line, i.e. minimize the cycle time for a given degree, operations of hoists are first analyzed in detail to avoid their collision. Then, operations related the re-entrance are modeled. Based on these work, a mixed integer linear programming model is proposed. An industrial instances is used to test the proposed model. It is solved using the commercial software ILOG CPLEX. Results illustrate the efficiency of the proposed approach.
Published in: 2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
Date of Conference: 15-18 December 2019
Date Added to IEEE Xplore: 03 February 2020
ISBN Information: