Abstract:
This paper presents an approach for scheduling different types of preventive maintenances (PMs) for a work center of a semiconductor manufacturing facility. The PM schedu...Show MoreMetadata
Abstract:
This paper presents an approach for scheduling different types of preventive maintenances (PMs) for a work center of a semiconductor manufacturing facility. The PM scheduling problem includes time-dependent synchronization constraints and is implemented in a constraint programming model. A mix of periodic and workload-specific maintenances is scheduled considering the synchronization to available engineers which have individual shift schedules and skills that define the range of feasible maintenances. This also comprises maintenances having process durations covering multiple shifts, which requires a continuous availability of sufficiently skilled engineers. Additionally to the PMs, also handling and maintaining of unscheduled downs is considered in the model. Multiple objectives are investigated and used for optimization and tested on realistic data. To compare the results an additional simulation model is built up.
Published in: Proceedings of the Winter Simulation Conference 2014
Date of Conference: 07-10 December 2014
Date Added to IEEE Xplore: 26 January 2015
ISBN Information: