2011 Volume E94.A Issue 2 Pages 842-845
The proposed scheduling scheme minimizes the mean energy consumption of a real-time parallel task, where the task has the probabilistic computation amount and can be executed concurrently on multiple cores. The scheme determines a pertinent number of cores allocated to the task execution and the instant frequency supplied to the allocated cores. Evaluation shows that the scheme saves manifest amount of the energy consumed by the previous method minimizing the mean energy consumption on a single core.