Overhead transmission line monitoring and inspection to date is largely done by human examination. This is inefficient, costly and time consuming. This paper considers en...Show MoreMetadata
Abstract:
Overhead transmission line monitoring and inspection to date is largely done by human examination. This is inefficient, costly and time consuming. This paper considers enabling a swarm of multicopters to continuously monitor the power network with the consideration of 1) the flight time and charging requirements of the swarm which is used to inform 2) the dynamic distribution of a swarm to autonomously survey the power network. To tackle these challenges we formulate a network time management and energy optimization problem to minimize the overall network monitoring time and introduce a line graph advection protocol to autonomously distribute the multicopters across the power network. The approach is simulated on the Australia’s east coast transmission line network to demonstrate the results
Published in: 2023 European Control Conference (ECC)
Date of Conference: 13-16 June 2023
Date Added to IEEE Xplore: 17 July 2023
ISBN Information: