Reference Hub5
Assessing Total Logistics Costs: Case Study During the Execution of Cement Projects in Indonesia

Assessing Total Logistics Costs: Case Study During the Execution of Cement Projects in Indonesia

Effnu Subiyanto
Copyright: © 2020 |Volume: 10 |Issue: 2 |Pages: 17
ISSN: 1947-9573|EISSN: 1947-9581|EISBN13: 9781799806783|DOI: 10.4018/IJAL.2020070103
Cite Article Cite Article

MLA

Subiyanto, Effnu. "Assessing Total Logistics Costs: Case Study During the Execution of Cement Projects in Indonesia." IJAL vol.10, no.2 2020: pp.45-61. http://doi.org/10.4018/IJAL.2020070103

APA

Subiyanto, E. (2020). Assessing Total Logistics Costs: Case Study During the Execution of Cement Projects in Indonesia. International Journal of Applied Logistics (IJAL), 10(2), 45-61. http://doi.org/10.4018/IJAL.2020070103

Chicago

Subiyanto, Effnu. "Assessing Total Logistics Costs: Case Study During the Execution of Cement Projects in Indonesia," International Journal of Applied Logistics (IJAL) 10, no.2: 45-61. http://doi.org/10.4018/IJAL.2020070103

Export Reference

Mendeley
Favorite Full-Issue Download

Abstract

Logistics infrastructure is widely known as the most significant economics hurdle in Indonesia over recent decades due to the limited logistics infrastructure. This study aims to examine total logistics costs during the execution of several cement projects in Indonesia within the period 2010-2018. The panel data method of eight cement projects in Indonesia has been developed, analysed, and measured. Due to the limited logistics infrastructures, the logistics cost rose to 27.129% of the Gross National Product (GNP) in Indonesia. Further, this paper provides suggestions for Indonesia's government to develop logistics infrastructure.

Request Access

You do not own this content. Please login to recommend this title to your institution's librarian or purchase it from the IGI Global bookstore.