Reference Hub10
Design of an Expert System for Distribution Planning System using Soft Computing Techniques

Design of an Expert System for Distribution Planning System using Soft Computing Techniques

Shabbir Uddin, Amitava Ray, Karma Sonam Sherpa, Sandeep Chakravorty
Copyright: © 2016 |Volume: 5 |Issue: 2 |Pages: 19
ISSN: 2160-9500|EISSN: 2160-9543|EISBN13: 9781466693517|DOI: 10.4018/IJEOE.2016040103
Cite Article Cite Article

MLA

Uddin, Shabbir, et al. "Design of an Expert System for Distribution Planning System using Soft Computing Techniques." IJEOE vol.5, no.2 2016: pp.45-63. http://doi.org/10.4018/IJEOE.2016040103

APA

Uddin, S., Ray, A., Sherpa, K. S., & Chakravorty, S. (2016). Design of an Expert System for Distribution Planning System using Soft Computing Techniques. International Journal of Energy Optimization and Engineering (IJEOE), 5(2), 45-63. http://doi.org/10.4018/IJEOE.2016040103

Chicago

Uddin, Shabbir, et al. "Design of an Expert System for Distribution Planning System using Soft Computing Techniques," International Journal of Energy Optimization and Engineering (IJEOE) 5, no.2: 45-63. http://doi.org/10.4018/IJEOE.2016040103

Export Reference

Mendeley
Favorite Full-Issue Download

Abstract

An expert system for distribution planning is proposed in this paper. Choosing a best location of a distribution substation and grouping the various load points to be fed from a particular distribution substation has always been a concern to the distribution planners. Here in this paper the authors present a hybridization of K-means clustering method with fuzzy context aware decision algorithm for choosing the optimum location of distribution substation and its feeder layout. K means clustering has been applied to various loads which are at different location to form a cluster with load points in closer proximity so that a substation could be placed for each cluster for the distribution of power. Fuzzy Context Aware Decision Algorithm based on the Analytical Hierarchy process (AHP) is then applied on each cluster to decide on the feeder layout connecting the load points in each cluster. The feeder layout is based on the various reliability factors and thus the result obtained will lead to optimum feeder path and will hence lower long range distribution expenses.

Request Access

You do not own this content. Please login to recommend this title to your institution's librarian or purchase it from the IGI Global bookstore.